12. PROCESSING OF HEATING PIPE ENDS
12.1 Outline
(1) Configuration
Power supply 100VAC, 50/60Hz
Power connection kit
About 2000
Heating pipe
Termination kit
About 500
Fig.
(2)Caution on connection of heating pipe
q The clearance between clamp supports must be about 1.2 m in the horizontal direction and about 3 m in the vertical direction.
w For a bent piping, bending should be moderate enough to ensure a minimum bending radius of 300 mm or more.
Clamp support
No good
Good
Fig.
(3)Connection diagram
A heater wire is wound around 2 isolated buses and it is brought into contact with the buses alternately at intervals of 300 mm (heating unit).
Power supply
Heating wire
300mm | 300mm | 300mm | 300mm | 300mm | 300mm |
|
| Fig. |
|
|
|