Fule

Gas extractor

 

 

(Note 1)

 

 

ZBAK

 

 

300 or

 

 

Note)

Vertical

 

 

more

300

 

 

Horizontal

 

(Note 2)

 

 

 

 

 

 

installation

 

 

Sampling

 

Leave 300mm space for inspection

 

 

pipe

 

 

 

 

and exchange of filter.

 

 

 

 

 

 

 

Gas outlet facing downward (or horizontal)

 

 

 

 

Use termination kit TFC-7HPT-10JM (Note 6) or

* Mating flange for

 

 

 

caulk with silicone bolding agent, etc. after

 

 

Radius 300mm

insulation of heater wire (for indoor installation).

installing extractor

 

 

or more

 

JIS 5K 65A FF

Heater power supply

 

 

 

* Supporting wire

 

100V AC

 

 

 

Teflon pipe φ 10/φ 8 or tube trace (heating pipe) SE-10C1-56-1-PVC-M

or equivalent.

Outer sheath for Teflon pipe ø10/ø8 is PVC and bundle outer sheath is ø33.

For pipe end processing, refer to Section 12.

(Note 7)

Gradient of 15˚ or more (Note 4)

* Support

(Note 3)

(φ 10/φ 8 teflon tube

Peel off covering

inside heating pipe)

by about 2m.

 

Gas

 

Power connection kit

conditioner

 

TFC-3HPT-10JM (Note 6)

 

Filter

Sample tube

(Note 5)

 

 

Drain

 

 

 

 

Drain

Outside exhaust

Direct lead-in

*

Gas conditioner (in panel)

(Note 7)

 

 

 

 

 

Gas analyzer

 

 

 

 

 

 

 

60 120 square

 

 

*Exhaust

 

 

hole for wiring

 

 

+ Drain

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Drain

* Drain port (Note 8)

Front-view diagram

The part marked by the asterisk is not supplied.

Fig. 4-1 Piping procedure

Note 1) To prevent aspiration of leaked air

Note 2) Install so that pipe end comes to nearly center of flue and is at right angle to the gas flow.

Note 3) Peel off heating pipe by about 2m in order to air-cool measured gas.

Note 4) Provide an inclination of 15° or more on the gas pipe so that drain will not accumulate in the event of power failure, etc.

Note 5) Exhaust and drain share the same output. In the case of indoor installation, provide a drain pot and carry out drain separation, and exhaust air outside (pipe inner diameter should be ø8 or more).

Note 6) Use this when utilizing a heating pipe. (Maker : Fujikin, Japan)

Note 7) The gas pipe (ø10/ø8 teflon tube) should be inserted directly into the gas conditioner.

Note 8) In outdoor application or in a cold district, protect the drain pot and pipes with a heat insulating material, etc. to prevent drain from freezing in winter.

– 4 –

Page 12
Image 12
Fuji Labs ZSP instruction manual Piping procedure