g

GE

7.3.7 Restore to normal operation after “total off”

View of the panel after pressing the button total off.

All Contacts are open;

Rectifier, Inverter and Static-Switch shutdown.

First operated unit

All other units of the system

1.Reset total offby pressing and holding the “total offbutton and then the inverter on( I ) key, on any of the Units simultaneously, until Load is supplied from Bypass and the Rectifiers start.

System output connects to Bypass Utility.

Rectifiers start with blinking LED.

At the end of Soft-start the LED’s remains lit.

The LCD screen on all Units shows LOAD ON BYPASS”.

FIRST OPERATED UNIT

All other units of the system

2.Connect the Battery to all Units by closing the external Battery Switches or Fuses, in case of External Battery.

Continue

OPM_SGS_USM_10K_40K_0US_V010.doc

62/88

Operating Manual SG Series 10, 20, 30 & 40 kVA