g
GE
3.Disconnect the Battery from all Units.
• Wait 5 minutes for
First operated unit | All other units of the system |
4.Disconnect the Utility supply from all Units.
• All LED’s are OFF.
First operated unit | All other units of the system |
End of procedure
OPM_SGS_USM_10K_40K_0US_V010.doc | 74/88 | Operating Manual SG Series 10, 20, 30 & 40 kVA |