g

GE

7.4.3 From Manual Bypass (Q2) to normal function On-line

Initial status: Load supplied from Manual Bypass.

All Q2 of the system closed.

First operated unit

All other units of the system

1.Connect the Battery to all Units by closing the external Battery Switch(es) or Fuses.

2.Close Q1 (Pos. I) on all Units.

The Rectifiers will start automatically and at the closure of Q1 of the last Unit, the Bypass of all Units will be activated.

First operated unit

All other units of the system

3. Open Q2 (Pos. O) on all Units.

First operated unit

All other units of the system

Continue

OPM_SGS_USM_10K_40K_0US_V010.doc

69/88

Operating Manual SG Series 10, 20, 30 & 40 kVA