g
GE
4.Press “inverter on” ( I ) key on first Unit.
•
•At the end of
•In case of sufficient output power, the output will transfer to Inverter.
•UPS output LED indicates Load on Inverter and the LCD must display on the main screen the status “LOAD ON INVERTER”.
First operated unit | All other units of the system |
5.Press “inverter on” ( I ) key on all other Units.
(Do not start the next Inverter until the sequence of the previous ends).
•As soon as the output power of the Inverters is sufficient to supply the Load, the output of the units with running Inverter will transfer to Inverter.
•All LED’s Inverter, Load on Inverter and Load supplied are ON.
•The LCD of the all Units, must display on the main screen the status
“LOAD ON INVERTER”.
First operated unit | All other units of the system |
The LCD must display on the main screen on all Units the status
“LOAD ON INVERTER”.
End of procedure
OPM_SGS_USM_10K_40K_0US_V010.doc | 78/88 | Operating Manual SG Series 10, 20, 30 & 40 kVA |