Lennox International Inc Dave Lennox Signature Collection XP17 System HEAT PUMPS, 506586-01 heat

Models: Dave Lennox Signature Collection XP17 System HEAT PUMPS 506586-01

1 54
Download 54 pages 9.7 Kb
Page 15
Image 15
1. FIRE, PERSONAL INJURY, OR PROPERTY

WRAP SERVICE VALVES

To help protect service valve seals during brazing, wrap water saturated cloths around service valve bodies and copper tube stubs. Use

4 additional water saturated cloths underneath the valve body to protect the base paint.

FLOW NITROGEN

 

 

WARNING

 

Flow regulated nitrogen (at 1 to 2 psig) through the refrigeration

 

 

 

5 gauge set into the valve stem port connection on the liquid service

1. FIRE, PERSONAL INJURY, OR PROPERTY

 

valve and out of the suction / vapor valve stem port. See steps 3A, 3B

DAMAGE will result if you do not wrap a water

 

and 3C on previous page and below for manifold gauge setup.

saturated cloth around both liquid and suction line

 

 

service valve bodies and copper tube stub while

 

BRAZE LINE SET

brazing in the line set! The braze, when complete,

 

 

must be quenched with water to absorb any residual

 

Water saturated cloths must remain water saturated throughout

heat.

 

6 the brazing and cool−down process.

2. Do not open service valves until refrigerant lines and

 

 

 

A Braze liquid line to liquid line service valve.

indoor coil have been leak−tested and evacuated.

 

Refer to procedures provided in this supplement.

 

 

 

B Braze suction / vapor line to suction / vapor service

 

 

valve.

 

 

6B

SUCTION / VAPOR LINE

WATER SATURATED CLOTHS

IMPORTANT Allow braze joint to cool. Apply additional water saturated cloths to help cool brazed joints. Do not remove water saturated cloths until piping has cooled. Temperatures above 250ºF will damage valve seals.

6A

WHEN BRAZING LINE SET TO

SERVICE VALVES, POINT FLAME AWAY

FROM SERVICE VALVE.

SUCTION / VAPOR SERVICE PORT

MUST BE OPEN AND SERVICE PORT

CORE REMOVED TO ALLOW EXIT

POINT FOR NITROGEN FLOW

LIQUID LINE

WATER SATURATED

CLOTHS

7PREPARATION FOR NEXT STEP

After all connections have been brazed, disconnect manifold gauge set from service ports. Apply additional water saturated cloths to both services valves to cool piping. Once piping is cool, remove all water saturated cloths. Refer to the unit installation instructions for the next step in preparing the unit.

Figure 10. Brazing Procedures (Continued)

Page 15

XP17 SERIES

Page 15
Image 15
Lennox International Inc Dave Lennox Signature Collection XP17 System HEAT PUMPS Fire, Personal Injury, Or Property, heat

FAQ

Why is it important to wrap service valves during brazing?

Wrapping service valves with water saturated cloths helps protect the valve seals and base paint during the brazing process.

What should I do after brazing all the connections?

After brazing, disconnect the manifold gauge set and apply additional water saturated cloths to the service valves to cool the piping. Once the piping is cool, remove the water saturated cloths as per the unit installation instructions.

How should I quench the braze once it's complete?

Quench the braze with water to absorb any residual heat and prevent damage to the valve seals.