Return to Master TOC
Return to Master TOC
Return to Master TOC
Return to Master TOC
TROUBLESHOOTING & REPAIR
MAIN GENERATOR FRAME REMOVAL
AND REPLACEMENT (continued)
FIGURE F.14 – TOP AND DOORS ASSEMBLY DETAILS
BOLT / NUT (4)
'L' DOOR HOOKS (4)
4.Using the 1/2” wrench, remove the four nuts and bolts holding the case top and doors assembly to the welder frame. Remove the rubber gasket from the top. Carefully lift up and remove the top and doors assembly.
Carefully remove the “L” shaped door hooks. See Figure F.14.