Lincoln Electric SVM136-A Troubleshooting & Repair, MAIN TRANSFORMER T1 VOLTAGE TEST continued

Models: SVM136-A

1 102
Download 102 pages 56.21 Kb
Page 58
Image 58
FIGURE F.6 – MAIN SECONDARY LEAD TEST POINTS

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-18

F-18

TROUBLESHOOTING & REPAIR

MAIN TRANSFORMER (T1) VOLTAGE TEST (continued)

FIGURE F.6 – MAIN SECONDARY LEAD TEST POINTS

Return to Section TOC

Return to Master TOC

8.Read the meter.

a.If proper voltage is present for all three phases, proper main input supply volt- age is being supplied.

b.If proper voltage is not present in any or all of the three phases, check input fuses and leads.

9.Test with an AC voltmeter for proper main input supply voltage from the output side of the input contactor (CR1). See the Wiring Diagram and Figure F.5.

a.T1 to T2.

b.T2 to T3.

c.T1 to T3.

10.Read the meter.

11.Test with an AC voltmeter for approximate- ly 42VAC across each of the three main secondary start leads located at the SCR/Diode Rectifier Bridge. Remove the red insulating paint to achieve good con- tact if necessary. See Figure F.6. See the Wiring Diagram.

a.If one or more of the above voltage tests are incorrect, check for loose or faulty connections.

b.If the connections are good, then the main transformer may be faulty. Re- place the main transformer.

Return to Section TOC

Return to Master TOC

a.If proper voltage is present for all three phases, the input contactor is working properly.

b.If the proper voltage is not present for any or all of the three phases, the input contactor may be faulty. Replace the input contactor.

IDEALARC CV-400

Page 58
Image 58
Lincoln Electric SVM136-A Troubleshooting & Repair, MAIN TRANSFORMER T1 VOLTAGE TEST continued, Return to Section TOC