CVX 600 Hardware Installation Guide

Replacing Modules and Filler Panels

Step

Action

5

Use a1/16-inch flat-tip screwdriver to tighten the four locking screws on the front of the SCC-LTM/RLTM.

 

4

System

5

Controller

 

only

 

 

6

Console

 

3

 

4

System

5

Controller

 

only

 

 

6

Clock

 

 

 

 

Clock

12

 

11

10

 

 

 

 

 

12

 

11

 

 

 

 

10

 

 

 

 

 

HSSI

 

 

 

 

 

 

3

 

 

 

 

 

10/100

 

 

RX

Link

Enet

 

 

 

 

99

 

2

 

RX

 

10/100

Link

Enet

 

88

 

1

 

RX

 

10/100

Link

Enet

 

7

 

6

 

5

 

4

 

7

3

6

2

5

 

4

 

 

3

Alarms Visual

2

1

Maj

Audible

Crit

Min

 

1

 

2

 

Main

Chassis

 

3

 

4

 

5

 

6

 

6

7

8

CVX-0157C

Reattach any network cabling and alarm wiring used on the SCC-LTM/RLTM you just removed.

Turn the power back on by turning on the switches on the PDUs.

Observe the LEDs on the SCC-LTM/RLTM to verify proper operation.

Reference

For information about the SCC-LTM and SCC-RLTM LEDs, see “Checking the LEDs” on page 2-43.

3-20

296-1011-202 Rel. 5.0, Doc. Rev. 02.01

Page 118
Image 118
Nortel Networks CVX 600 manual CVX-0157C