Chassis Installation

Preparing for the CVX 600 Installation

Step

Action

 

 

3Remove the box containing the accessory kit and other parts. (The AC chassis option will have two power cords. The DC chassis option will have none.)

4Remove the packing material surrounding the chassis.

5Using a Phillips screwdriver, remove the six screws that secure the chassis to the pallet brackets.

Turn counterclockwise to remove screws.

Phillips screwdriver

 

O

1

 

 

CVX 6oo

2

 

3

O

4

 

5

 

6

 

Phillips screwdriver

Turn counterclockwise

to remove screws.

CVX-0221A

 

6Using a 9/16-inch wrench, remove the four bolts that secure the pallet brackets to the pallet.

7Remove the four pallet brackets from the pallet.

8Carefully remove the chassis from the pallet.

Checking the Shipment

Carefully inspect the shipment for completeness, ensuring the items in the shipping container match those on the packing list affixed to the shipping container. In particular:

Confirm that the shipment includes any additional cables you have ordered.

Check all items for shipping damage.

Note: If you detect or suspect any damage, do not install the CVX 600 chassis. See “Technical Support” on page xviii.

296-1011-202 Rel. 5.0, Doc. Rev. 02.01

1-15

Page 35
Image 35
Nortel Networks CVX 600 manual Checking the Shipment