Chassis Installation

Installing the CVX 600 Chassis

Telco and EIA Rack Hole Spacing

You can use mounting flanges to install the CVX 600 chassis in a Telco or EIA rack. Telco and EIA racks have 0.5-inch spacing between the dual mounting holes, and 0.625-inch spacing between the dual mounting hole pairs.

The following figure shows the positions on the mounting flange that you use for Telco and EIA racks.

AC chassis option

DC chassis option

1

1

2

2

3

3

4

4

5

5

6

7

EIA: Use positions 2 and 4

TELCO: Use positions 1, 3, 5

EIA: Use positions 1, 3, 5, 7

TELCO: Use positions 2, 4, 6

CVX-0222A

Note: Before you install the CVX 600 chassis in a rack, determine the type of rack you have so that you can properly align the mounting holes.