Chassis Installation

Mounting the CVX 600 in a Rack

Reference

For PTE 2000 rack installation instructions, see the PTE 2000 Installation Guide (IM 07-08-1543).

Anchor Kits

Nortel Networks offers four types of PTE 2000 anchor kits; each kit contains two anchors. If you do not plan to order anchor kits from Nortel Networks, you can use other anchor kits that provide the same level of seismic protection.

Note: You must use six floor anchors to secure the PTE 2000 rack to the equipment-room floor.

The following table describes each of the anchor kits.

Kit Number

Earthquake Zone

Floor Type

Notes

Compliance

 

 

 

 

 

 

 

NTRU0324

Up to and including zone 4

Raised or concrete

Includes M12

 

 

floor

anchoring hardware

 

 

 

(2 anchors)

 

 

 

 

NTRU0328

Up to and including zone 4

Concrete floor only

Includes M12

 

 

 

anchoring hardware

 

 

 

(2 anchors)

 

 

 

 

NTRU0323

Up to and including zone 2

Raised or concrete

Includes 3/8 in.

 

 

floor

anchoring hardware

 

 

 

(2 anchors)

 

 

 

 

NTRU0326

Up to and including zone 2

Concrete floor only

Includes 3/8 in.

 

 

 

anchoring hardware

 

 

 

(2 anchors)

 

 

 

 

296-1011-202 Rel. 5.0, Doc. Rev. 02.01