CVX 600 Hardware Installation Guide

Connecting Power to the Chassis

Using the NEBS-Compliant Dual-Connector Posts

Note: In addition to the grounding location shown in the following section, the AC chassis option also contains an identical grounding location in the upper right corner of the rear of the chassis. Either location may be used.

To ground the CVX 600 chassis using the NEBS-compliant dual-connector posts, follow these steps:

Step

Action

 

 

1Locate a suitable ground cable at your facility.

2On the back of the chassis, locate the posts with the ground symbol.

3Remove the #8 locking nuts, using a 11/32-inch nut driver to loosen the nuts.

4

Console

4

5 6

11/32-inch nutdriver

Turn counterclockwise to loosen nuts.

CVX-0223A

Remove the connector assembly from the posts if you are using a ground cable with a NEBS-compliant ground fitting.

2-18

296-1011-202 Rel. 5.0, Doc. Rev. 02.01

Page 62
Image 62
Nortel Networks CVX 600 manual Using the NEBS-Compliant Dual-Connector Posts, Step Action