Nortel Networks Preparing for the CVX 600 Installation, Unpacking the Shipment, Step Action

Models: CVX 600

1 168
Download 168 pages 8.82 Kb
Page 34
Image 34

CVX 600 Hardware Installation Guide

Preparing for the CVX 600 Installation

Preparing for the CVX 600 Installation

Overview

To prepare for the installation of the CVX 600 chassis, make sure:

The shipment is complete and undamaged.

You have the proper equipment and tools.

You have network lines available.

Unpacking the Shipment

The CVX 600 is secured to a pallet and covered by a box to protect the contents during shipment. Move the shipping container to the installation site before unpacking the CVX 600.

To unpack the CVX 600, follow these steps:

Step

Action

 

 

1Using a screwdriver or other tool, pry down the tabs that secure the box to the pallet.

2

CVX-0182B

Lift the box up and off the pallet.

1-14

296-1011-202 Rel. 5.0, Doc. Rev. 02.01

Page 34
Image 34
Nortel Networks manual Preparing for the CVX 600 Installation, Unpacking the Shipment, Step Action