CVX 600 Hardware Installation Guide

Preparing for the CVX 600 Installation

Preparing for the CVX 600 Installation

Overview

To prepare for the installation of the CVX 600 chassis, make sure:

The shipment is complete and undamaged.

You have the proper equipment and tools.

You have network lines available.

Unpacking the Shipment

The CVX 600 is secured to a pallet and covered by a box to protect the contents during shipment. Move the shipping container to the installation site before unpacking the CVX 600.

To unpack the CVX 600, follow these steps:

Step

Action

 

 

1Using a screwdriver or other tool, pry down the tabs that secure the box to the pallet.

2

CVX-0182B

Lift the box up and off the pallet.

1-14

296-1011-202 Rel. 5.0, Doc. Rev. 02.01

Page 34
Image 34
Nortel Networks manual Preparing for the CVX 600 Installation, Unpacking the Shipment, Step Action