CVX 600 Hardware Installation Guide

Connecting Power to the Chassis

Step

Action

 

3

Use a flat-tip screwdriver to loosen the locking screw.

 

 

4

 

Console

5

 

 

6

 

1/4-inch flat-tip

 

 

screwdriver

 

Turn counterclockwise to loosen screw.

CVX-0225A

4Use a wire stripper to remove approximately 1/2 inch of insulation from the ground cable.

5Insert the stripped end of the wire into the compression terminal; ensure that the wire is inserted between the retainer and the back of the connector. If the screw comes in contact with the wire, remove the wire and insert it below the retainer to ensure a proper ground connection.

 

4

Console

5

 

6

1/4-inch flat-tip screwdriver

 

To facility ground

Turn clockwise

 

to tighten screw

 

to 24 in-lb.

CVX-0246A

6Use the flat-tip screwdriver to tighten the locking screw to 24 in-lb.

7Ensure that the other end of the ground cable is properly connected for frame grounding.

2-20

296-1011-202 Rel. 5.0, Doc. Rev. 02.01

Page 64
Image 64
Nortel Networks CVX 600 manual Use a flat-tip screwdriver to loosen the locking screw