Section 1, Overview
FigurePay attention to the notices of “Danger” “Warning” “Caution” and “Notice” in this manual.
1.4Critical Factors
THE INSTALLATION SHALL BE IN ACCORDANCE WITH THE REGULATIONS OF AUTHORITIES HAVING JURISDICTION
The key factors to keep in mind when planning and carrying out the installation are:
•Mounting location restrictions for the Oasis™ Heating Module, optional Distribution Module , and exhaust outlet (to reduce noise, vibration, heat loss, etc.).
•Length, routing and sizing of fluid lines, fuel lines,
•Unrestricted vent required to draw in 100% outside air for combustion.
International Thermal Research |