Section 9, Installing the Distribution Module
!DANGER
NOTICEWARNOTIINGCE
Use only a
Do not operate the Oasis™ Heating Module and Distribution Module, DM12 (Optional) until coolant is in the Oasis™ Heating Module and Distribution Module and all trapped air has been bled.
All plumbing lines must be run and secured so as to prevent damage, chafing and kinking.
9.5 Filling/Purging the heating system
The Distribution module contains two valves with ½”NPT connections to be used for filling the heating loop. To initially fill up and bleed the air out of the system, do the following:
1.Connect a hose to the outlet of a diaphragm pump and to the “fill inlet valve” on the distribution module. Attach a hose to the