Section 9, Installing the Distribution Module

inlet of a diaphragm pump and place the hose in a container filled with a 50/50 mixture of propylene glycol and water (see Figure 9-8).

2.Connect a hose to the “fill outlet valve” on the distribution module and place the other end of the hose in the same container.

Figure 9-8: Initial fill up Oasis system

3.Open both valves on the Distribution module.

4.Turn ON the diaphragm pump. This will prime the pumps in the Oasis Distribution Module. It may be necessary to fill up the container with more coolant as the air is being bleed from the system.

5.Turn on the pump activation switch, located on top of the zone box, this will activate the pumps inside the distribution module and fill up both heating loops.

9-8

The Oasis™ Heating Module