Section 1, Overview

1.1Unpacking the Oasis™ Heating Module

When you receive the Oasis™ Heating Module:

1Unpack it carefully.

2Check each component against the shipping list to ensure that you have everything and that all parts arrived undamaged.

3If you discover any missing or defective parts call ITR immediately.

4If you are not installing the Oasis™ Heating Module right away secure all components so none will be misplaced.

5Before installing the Oasis™ Heating Module read the rest of this Installation and Operating Manual. It contains critical information for a proper installation.

A properly installed Oasis™ Heating Module is essential for several reasons:

To ensure that you and/or your customers receive satisfactory results and enjoy a warm, comfortable environment.

To ensure a trouble-free installation, a successful inspection and testing process, and ease of future maintenance.

To protect your Warranty.

1.2Protect Your Warranty

This document reflects approved installation techniques, methods, and materials, and applies only to ITR equipment. The Oasis™ Heating Module is only guaranteed by ITR if the entire system has been installed according to the requirements and recommendations set out here.

This includes:

Deviations from the instructions in this Manual.

Changes to any piece of ITR-supplied equipment.

Substitution of a non-ITR approved component.

No Warranty will be extended to improper installations. Use of any unapproved materials, equipment or installation procedures will

1-2

The Oasis™ Heating Module