UNPACKING THE RACK MOUNT CONFIGURATION
To unpack the LF 6600 Rack Mount configuration, refer to the next figure and perform the following procedure:
1)Move the carton to the installation site. Unpacking the carton at the installation site minimizes the effects of vibration and shock.
2)Cut the tape that secures the top of the box. Do not allow the cutting blade to penetrate into the carton.
3)Carefully lift the outer corrugated carton up and remove it.
4)Remove the accessories box (inner carton) containing cables and documentation, and remove the ESD protective packing material.
5)Remove the two cushions which support the accessories box (inner carton).
6)Carefully lift and remove the LF 6600 from the shipping carton and place it on a flat surface capable of supporting 48 kg (106 lbs). A wheeled cart is recommended for transporting the LF 6600 within a building. Precautions should be taken to avoid sudden bumps and jarring.
CAUTION
The bezel is slightly larger than the chassis. When placing the drive onto a flat surface, allow the front end of the LF 6600 to extend over the edge of the supporting surface so that the bezel does not bear any weight.
7)Open the media access door and remove the foam insert. Manually move the shuttle all the way to the right to the home shuttle position.
PLASMON LASER MAGNETIC STORAGE - LF 6600 User Manual Page 26