SuperTrak EX Series User Manual

10.Replace the screw holding the SuperTrak EX Controller card to the system case.

11.Attach the SAS multi-lane cables to the SuperTrak EX Controller card.

12.Replace the cover of your system.

13.Power-up the system and launch WebPAM PRO. See “Logging into WebPAM PRO” on page 83.

After installation and power-up, a new battery takes several hours to charge. From that time, it should show Fully Charged. See “Viewing Battery Information” on page 118.

212

Page 224
Image 224
Promise Technology EX4650A, EX8650A user manual 212