A

4 – Installation Installing a Switch

To power up a SANbox 5000 Series switch, do the following:

„For a model 5200/5600 switch, connect the power cord to the AC power receptacle on the front of the switch chassis and to a grounded AC outlet.

„For a model 5202/5602 switch, connect the power cords to the power supply receptacles on the back of the switch chassis and to a grounded AC outlet. To provide redundancy in the event of an AC power circuit failure, connect the switch power supplies to separate AC circuits.

The switch responds in the following sequence:

1.The chassis LEDs (Input Power, Heartbeat, System Fault) illuminate followed by all port Logged-In LEDs. The Logged-In LEDs that illuminate indicate the ports that are enabled.

2.After a couple seconds the System Fault LED is extinguished while the Input Power LED and Heartbeat LED remain illuminated.

3.After approximately one minute, the POST executes and the Heartbeat LED is extinguished.

4.After about another minute, the POST is complete, all LEDs are extinguished except the Input Power LED and the Heartbeat LED:

„The Input Power LED remains illuminated indicating that the switch logic circuitry is receiving DC voltage. If not, contact your authorized maintenance provider.

„The Heartbeat LED indicates the results of the POST. The POST tests the condition of firmware, memories, data-paths, and switch logic circuitry. If the Heartbeat LED blinks steadily about once per second, the POST was successful, and you can continue with the installation process. Any other blink pattern indicates that an error has occurred. Refer to “Heartbeat LED Blink Patterns” on page 5-3for more information about error blink patterns.

59096-04 A

4-13

Page 83
Image 83
Q-Logic 5000 manual Installation Installing a Switch