Rinnai E110CP, E75CN, E75CP 6.1.2Safety valve, 6.1.3Low water cut off, 6.2Expansion tank, i NOTICE

Models: E75CP E110CN E75CN E110CP

1 108
Download 108 pages 9.51 Kb
Page 20
Image 20
6.1.2Safety valve

6.1.2Safety valve

i NOTICE

An ASME 30 psi pressure relief valve is installed on the plumbing kit included

with the boiler.

6.1.3Low water cut off

The Rinnai E boiler has a factory installed pressure switch type Low Water Cut

i NOTICE Off (LWCO). Check your local codes to see if a Low Water Cut Off is required (LWCO) and if this device conforms to local code. See the Rinnai Boiler Applications Manual for further information.

The Low water cut off is not serviceable.

6.2Expansion tank

i NOTICE

Installation & Servicing Instructions Rinnai E-Series

The E-Series boilers are equiped with an internal expansion tank.

The tank of the E75CN and E75CP is positioned inside the boiler casing. This expansion tank has a pre-charge pressure of 14.5 PSI / 1 Bar and a capacity of 2.1 gallon / 8 litres.

The tank of the E110CN and E110CP is positioned directly beneath the boiler and together with the casing forms a single entity with the boiler.

The casing can be removed by pulling forwards. The expansion tank has a pre-charge pressure of 14.5 PSI / 1 Bar and a capacity of 3.1 gallon / 12 litres.

If a larger capacity expansion tank is needed for the installation a standard expansion vessel should be fitted additionally.

In that case choose an expansion tank volume, of which the summary is geared to the installation’s water capacity. The pre-charge pressure depends on the installation height above the expansion tank. Fit the expansion tank into the return pipe as close as possible to the boiler. The extra expansion tank should be sourced locally. Please refer to the expansion tank manufacturer for further information.

Fill the expansion tank to a minimum of 14.5 psi.

20