Rinnai E110CP, E75CN, E110CN 6.7.3Installation of the vent system, i NOTICE i NOTICE i NOTICE

Models: E75CP E110CN E75CN E110CP

1 108
Download 108 pages 9.51 Kb
Page 28
Image 28
6.7.3Installation of the vent system

6.7.3Installation of the vent system

i NOTICE

i NOTICE

i NOTICE

A

Consult local and state codes pertaining to special building code and fire department requirements. Adhere to national code requirements.

Follow the listed maximum length of vent systems, which are boiler output dependent. The maximum permissible lengths are listed in table 9, chapter 6.7.6.

Decide how to install the exhaust and air intake system. You can choose between:

-Concentric system (see page 26)

The concentric connection is provided standard initially.

The boiler concentric connection diameter is 3"/5" (80/125 mm), to which the venting and air supply system can be fitted, with or without elbow pieces. The maximum permissible pipe length is displayed in table 9, chapter 6.7.6.

-Parallel system (see page 27)

The boiler can be converted to a parallel system with supplied adapters.

It is possible to use a parallel pipe connection of 2x 3". In this case a seperate supplied kit, with 2 vent adapters 3" (ø80mm), cover 5" (ø125mm), vent exhaust pipe and gaskets should be fitted instead of the concentric vent adapter on top of the boiler. See figure 12 for installation. The maximum permissible pipe length is set out in table 9, chapter 6.7.6.

-Room Air System (outdoor combustion air)

The boiler can use room air for combustion. If this option is selected the boiler must first be converted to the Parallel system. A single exhaust pipe can then be fitted. It is required to use a room air filter when using indoor air for combustion. The maximum permissible pipe length is set out in table 9, chapter 6.7.6.

We advise to install a vent system out of the venting system program supplied by Rinnai (See chapter 19 Parts list Vent system). For further information about the available components of the venting and air supply system we recommend you consult Rinnai and the Installation instructions and parts list documentation.

B

C

10

D

9

7

2 4 i NOTICEManual backgroundManual background 6

Rinnai E-Series

3

1

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background 8

5

Installation & Servicing Instructions

boiler conversion from concentric to parallel

figure 12

A.1. Push the 2 clips slightly outwards

B.2. Pull the concentric adaptor out of the boiler

3.Press the cover in the connection at the back from inside out

C.4. Push the 3" adapter into the connection at the back of the boiler (= air intake)

5.Pull the rubber seal around the bottom of the exhaust connector

6.Push the exhaust connector in the boiler, in the boiler exhaust pipe until 'CLICK'

7.Push the 5" cover over the exhaust connector in the 5" opening until 'CLICK'

8.Push the rubber plug in open position in the O2 measuring opening and close the stop.

9.Push the gasket around the top of the exhaust connector

10.Push the 3" exhaust adaptor in the exhaust connector.

D.Connect the parallel vent system.

28

Page 28
Image 28
Rinnai E110CP, E75CN, E110CN, E75CP user manual 6.7.3Installation of the vent system, i NOTICE i NOTICE i NOTICE