Rinnai E75CN, E110CP 15.1.3Block, 15.1.4Block, check flow through the boiler and DHW fascility

Models: E75CP E110CN E75CN E110CP

1 108
Download 108 pages 9.51 Kb
Page 65
Image 65
15.1.3Block 12

15.1.3Block 12

maximum average DT of supply and return sensor for hot water is repeatedly exceeded. Operation is normally possible for the central heating installation during the block. The pump continues to operate at minimum capacity during the block.

check flow through the boiler and DHW fascility

see the installation instructions for the hydraulic connections to the boiler

possible causes: (radiator) shut-off valves closed or blocked water filter

resistance (coil) in DHW fascility to high (see pump height)

check 3-way-valve on function and pollution.

15.1.4Block 60

incorrect parameter setting for the minimum or maximum power

Execute

Parameter-Reset.

an incorrect setting has been detected. The factory settings are activated after the "green key function" is executed:

Make sure that the text check flow through the boiler and DHW fascility15.1.4Block 60Execute can be seen on the display. Continue to press the Store

key until Manual backgroundappears on the display. The factory settings are now copied and the boiler will come into operation normally.

Installation & Servicing Instructions Rinnai E-Series

65

Page 65
Image 65
Rinnai E75CN, E110CP 15.1.3Block, 15.1.4Block, check flow through the boiler and DHW fascility, Execute Parameter-Reset