i NOTICE | It can take a while before all air has disappeared from a filled installation. | ||||||
|
| Especially in the first week noises may be heard which indicate the presence | |||||
|
| of air. The automatic air vent in the boiler will remove this air, which means | |||||
|
| the water pressure can reduce during this period and therefore topping off | |||||
|
| with water will have to be done. | |||||
|
| During normal use the following messages can occur with the necessary follow up: | |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water pressure is too low (<10 PSI), FILL indication remains continuously visible, the boiler is taken out of operation. The installation needs to be topped off.
Water pressure is too low (<14,5 PSI), flashing FILL will alternate with indication of water pressure, boiler power of 50% is possible. The installation needs to be topped off.
Water pressure is too high (>52,2 PSI), if HIGH indication remains continuously visible, the boiler is taken out of operation. The installation pressure needs to be decreased by draining water.
9.3 Hot water supply
Apply the water pipe pressure to the DHW fascility (open main valve and/or stop valve of the safety group).
Vent the DHW fascility and the hot water installation by opening a hot water shut off valve. Leave the shut off valve open for as long as required until all air has disappeared from the DHW fascility and the pipes and only water is flowing from the shut off valve.
Installation & Servicing Instructions Rinnai
44