Freeze protection
Freeze protection for new or existing systems must use glycol that is specially formulated for this purpose. This includes inhibitors, which prevent the glycol from attack the metallic components. This should be for
Make certain to check that the system fluid is correct for the glycol concentration and inhibitor level. The system should be tested at least once a year and as recommended by the producer of the glycol solution.
Use only Rinnai approved inhibitors. See the Rinnai Boiler Applications Manual for an approved list of inhibitors.
Use only inhibited propylene glycol solutions, which are specially formulated for central heating systems. Ethylene glycol is toxic and can attack gaskets and seals used in the boiler and system. Approved glycols ae listed in the Rinnai Boiler Applications Manual.
Additives in the installation water are not permitted.
9.2 Filling the heating system
For filling or topping up the installation you use the filling loop according to the following procedure:
1Switch on the power supply;
2The display will show FILL;
3All functions off (heating , DHW and pump );
4Push briefly the
5 Open the filling loop (Indication on display increases);
6 Fill up slowly to 22 to 25 PSI;
7 STOP appears on the display;
8 Close the filling loop;
9
11 Close the filling loop;
12 Activate the functions in use (heating , DHW and/or pump ); 13 If A XX appears on the display, wait for 17 minutes;
14 Check the water pressure and if necessary top it up to 22 to 25 PSI
15 Close the filling loop;
16 Press the
17 Be sure that the filling loop is closed.
18 After the automatic
Check the water pressure regularly and top off the installation when necessary. The working pressure of the installation should be between 22 and 25 PSI when the system is cold.