Rinnai E75CP, E110CP, E75CN, E110CN user manual Filling the heating system, Notice

Models: E75CP E110CN E75CN E110CP

1 108
Download 108 pages 9.51 Kb
Page 43
Image 43
9.2 Filling the heating system

i

!

i

NOTICE

WARNING

NOTICE

Freeze protection

Freeze protection for new or existing systems must use glycol that is specially formulated for this purpose. This includes inhibitors, which prevent the glycol from attack the metallic components. This should be for multi-metallic components.

Make certain to check that the system fluid is correct for the glycol concentration and inhibitor level. The system should be tested at least once a year and as recommended by the producer of the glycol solution.

Use only Rinnai approved inhibitors. See the Rinnai Boiler Applications Manual for an approved list of inhibitors.

Use only inhibited propylene glycol solutions, which are specially formulated for central heating systems. Ethylene glycol is toxic and can attack gaskets and seals used in the boiler and system. Approved glycols ae listed in the Rinnai Boiler Applications Manual.

Additives in the installation water are not permitted.

9.2 Filling the heating system

For filling or topping up the installation you use the filling loop according to the following procedure:

1Switch on the power supply;

2The display will show FILL;

3All functions off (heating Manual backgroundManual background, DHW Manual background and pump Manual background);

4Push briefly the 'STEP'-button: P XX (XX = water pressure in PSI);

5 Open the filling loop (Indication on display increases);

6 Fill up slowly to 22 to 25 PSI;

7 STOP appears on the display;

8 Close the filling loop;

9 De-aerate the complete installation, start at the lowest point; 10 Check the water pressure and if necessary top it up;

11 Close the filling loop;

12 Activate the functions in use (heating Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background, DHW Manual background and/or pump Manual background); 13 If A XX appears on the display, wait for 17 minutes;

14 Check the water pressure and if necessary top it up to 22 to 25 PSI

15 Close the filling loop;

16 Press the ‘STEP’-button;

17 Be sure that the filling loop is closed.

18 After the automatic de-aeration program (A XX) is finished the boiler will return to the Good state or Technical read out.

Check the water pressure regularly and top off the installation when necessary. The working pressure of the installation should be between 22 and 25 PSI when the system is cold.

Installation & Servicing Instructions Rinnai E-Series

43

Page 43
Image 43
Rinnai E75CP, E110CP, E75CN, E110CN user manual Filling the heating system, Notice