12.3 Checking for contamination
i NOTICE | In order to be able to check the boiler for contamination in the following running | |||
years it is advisable to measure the maximum air displacement in the boiler | ||||
| when putting the boiler into operation. This value can be different with each | |||
| type of boiler. |
|
| |
| In order to be able to measure this value follow the next procedure: | |||
| - | Press the | for 5 seconds. |
|
| - The display will show COdE followed by an arbitrary number; | |||
| - | Select by means of the | or the | button the code C123; |
| - Press the | |||
| - Press the | |||
| - Press the |
| ||
|
| alternately 2 and OFF will be shown. |
| |
| - Turn open the upper measuring nipple on the gas valve (fig. 18); | |||
| - Connect the hose of the digital pressure gauge to the upper measuring nipple of | |||
|
| the gas valve |
|
|
Installation & Servicing Instructions Rinnai
Check point contamination
|
| figure 18 |
|
| |
|
| - | Press the | button until the maximum value is achieved; | |
|
|
|
| The fan will function to its maximum revolutions (burner stays off) | |
i | NOTICE |
| - Measure the under pressure and write down this value. | ||
|
| At the next servicing visit this value may drop 20% of its original value on | |||
|
|
|
| the moment of installation. When this value is dropped more than 20% the | |
|
|
|
| boiler needs maintanance. | |
|
|
| - | Press the | button until OFF is shown (keep button pressed) |
|
|
| |||
|
|
|
|
| With this the procedure is finished. |
|
|
|
|
|
52