1. Installation

1. Installation

Unpacking Checklist

Before setting up, make sure you have all of the following items.

If any are missing, contact your dealer or retailer.

1. Installation

Paper tray

Rapid key

Operation

Telephone

Imaging

extension

labels

manual

line cord

film cartridge

Original

Handset

Handset

Gears (4)

Imaging film

document

 

cord

 

(initial starter roll)

support

 

 

 

 

Points to keep in mind when setting up

Do not place the

Do not place the

Keep dust away from

Keep the area

machine in direct

machine near

the machine.

around the

sunlight.

heaters or air

 

machine clear.

 

conditioners.

 

 

About condensation

If the machine is moved from a cold to a warm place, it is possible that condensation may form on the scanning glass, preventing proper scanning of documents for transmission. To remove the condensation, turn on the power and wait approximately two hours before using the machine.

9

Page 11
Image 11
Sharp UX-340LM manual Installation, Unpacking Checklist, Points to keep in mind when setting up, About condensation