∙“Compressor Hourmeters” contains the lifetime and resettable hour meters to show the number of hours that the compressors have been running
∙If the chiller was configured to operate the chilled water pump tank, there are three screens to configure and view the pump tank setup. The configuration screen allows for the user to turn on or off any of the pumps as well as configuring the lead/lag rotation (if multiple pumps were configured)
∙“Chiller Configuration” shows the configuration of the chiller itself including the chiller temperature setpoint, temperature alarm settings, as well as setting up the lead/lag rotation, and the ability to turn on and off the compressors.
∙“PanelView Utilities” and “ACS Service” are both password protected sections of the PLC that are used to configure the display and the initial configuration of the chiller and system.
The following sections in this chapter list the information you need to navigate through these screens for operating and monitoring your SSC Series central chilling station with the Standard Control Package.
8-4 Viewing and Operating Chiller Compressors
Viewing Compressor Status
To view the status of the chiller compressors, start at the Main
Menu screen, then:
nPress the Up or Down buttons on the right side of the screen to highlight “System Information”
nPress ↵
The chiller status screen displays:
Page 60 of 86 | SSC Series Central Chilling Stations |