I

Alarms

Advanced Controls, 68 Standard Controls, 53

Available options, 9

Checking Motor Direction, 25 Chiller Pumps

Advanced Controls, 64 Chiller Shutdown, 38 Circuit Alarm Sequence, 27 Compressor Lead-Lag, 27 Compressor Staging Sequence,

27, 31

Condenser Maintenance, 73 Copyright information, 2

Determining Flow Rate, 38 Disclaimer information, 2

Electrical connections, 19 Electrical wiring schematics, 20 Evaporator Maintenance, 74

Freezestat Control, 28

Galvanic Corrosion Considerations, 23

General information Available options, 9 Models covered, 8 Necessary documents, 7 Standard features, 8

Graphic Panel Devices, 41 Indicator Lights and Control

Switches, 41

Incomplete shipment, 16 Incorrect shipment, 16 Installation information, 19–25

Checking Motor Direction, 25 Connection Sizing

Considerations, 23 Electrical connections, 19 Galvanic Corrosion

Considerations, 23 Location considerations, 19 Piping Considerations, 21 Process Water Connections,

21

Remote Air-Cooled Condensers, 24

Tank Piping Connections, 22 Water Treatment

Considerations, 23

Water-Cooled Condenser Connections, 23

Location considerations, 19

Makeup Valve Maintenance, 74 Models covered, 8

Motors

Checking Direction, 25

Necessary documents, 7

Operating Compressors

Advanced Controls, 60

Standard Controls, 46

Options, 9

Piping Considerations, 21

Process Water Connections, 21

Pump Lead-Lag, 27

Pump Seal Maintenance, 74

Pump Tank Piping Connections,

22

SSCR Condenser Specifications, 14

SSCR drawing, 13 SSCR specifications, 13 SSCW drawing, 11 SSCW specifications, 12 Remote Air-Cooled Condenser

Installation, 24

Remote Air-Cooled Startup, 37 Remote Air-Cooled Startup

Checklist, 35 Returns, 16 Revision number, 2 Routine Maintenance, 73–75

Condensers, 73

Evaporators, 74

Lubrication, 73 Makeup Valve, 74 Pump Seals, 74

Safety considerations, 3 Sequence of Operation, 25–31

Alarms, 27

Chilled Water Circuit, 28 Chilled Water Manifold, 31 Compressor Staging, 27 Condenser Water Manifold,

31

Control Nipple, 31

Control Probe, 31

Flow Switch, 30 Freezestat Control, 28

Index

High Pressure Cutout, 30 Lead-lag Compressors, 27 Lead-Lag Pumps, 27 Low Pressure Cutout, 30 Refrigeration Circuit, 28

Shipping damages, 15 Shipping information, 15–17

Incomplete shipment, 16 Incorrect shipment, 16 Returns, 16

Shipping damages, 15 Uncrating, 17

Unpacking and inspection, 15 Specifications

SSCR, 13

SSCR Condensers, 14 SSCW, 12

Standard Controls Touchscreen, 44, 58

Standard features, 8 Startup Checklist, 33–39

Chiller Shutdown, 38 Determining Flow Rate, 38 Introduction, 33

Remote Air-Cooled, 35 Remote Air-Cooled Startup,

37

Water Cooled, 33

Water Cooled Startup, 35 System Temperatures

Advanced Controls, 71

Troubleshooting, 73–75

Uncrating, 17

Unpacking and inspection, 15 Using the Advanced

Touchscreen Interface, 57–72 Alarms, 68

Chiller Pumps, 64

Getting Started, 59 Introduction, 57 Operating Chiller

Compressors, 60 System Temperatures, 71

Using the Standard Touchscreen Interface, 44, 43–56, 58 Alarms, 53

Getting Started, 45 Introduction, 43 Operating Chiller

Compressors, 46

Water Connection Sizing

Consideration, 23

Water Cooled Startup, 35

SSC Series Central Chilling Stations

Page 81 of 86

Page 81
Image 81
SterlingTEK A0551797 manual Index