To Process

The chilled water supply outlet leading to the process being controlled.

From Process

The chilled water return for water returning back to the chiller from the process to be cooled and recirculated.

3-5 Making Tank Piping Connections

If you have purchased the SSC Series central chilling station with the integral pump tank, please proceed with this section.

Return

Bring the chilled water returning from the process to the pump tank warm From Process side. This line is sized according to the flow rate from the process to the pump tank. See Section 3-3 on Page 21 for more information on piping considerations.

Important!

Do not use the SSC Series unit to support piping.

Makeup

Connect a city water source to maintain water level in the pump tank.

Overflow

Connect the OVERFLOW outlet to an approved, trapped drain to permit excess water in the pump tank to overflow to the drain. The overflow line is sized according to the size of the pump tank.

To Drain

Connect to a 1½” line (approx. 63 mm) leading to an approved, trapped drain. You can drain the pump tank if necessary.

Page 22 of 86

SSC Series Central Chilling Stations

Page 22
Image 22
SterlingTEK A0551797 manual Making Tank Piping Connections, From Process