2-6 Uncrating Your New Chiller

! WARNING !

DUE TO THE SIZE AND WEIGHT OF SSC SERIES CHILLERS, STERLING RECOMMENDS USING BONDED PROFESSIONAL MILLWRIGHTS TO UNLOAD AND MOVE SSC SERIES CHILLERS.

Rig the chiller from the frame only, using spreader bars to prevent load transfer to any chiller components. Rig the frame from at least four points and balance the load before lifting to clear the skid. Use a forklift of adequate size when lifting the chiller by the fork pockets.

Insert the forks all the way into the pockets and be sure to balance the load before lifting the chiller to clear the skid. Lift only as high as necessary. Use a pry bar to free the skid if necessary. Lower slowly. Retain the crating in case reshipment is necessary due to hidden shipping damage.

Caution!

Due to the weight of these units, use extreme caution

when moving and placing SSC Series chillers.

.

SSC Series Central Chilling Stations

Page 17 of 86

Page 17
Image 17
SterlingTEK A0551797 manual Uncrating Your New Chiller