Visual Inspection of Mechanical Connections
Visual Inspection of Mechanical Connections
To perform a visual inspection of the PV100S mechanical connections:
1. | Ensure that the AC and DC Disconnect Switches, as well as any utility | ❐ |
| interconnect circuit breakers or main disconnect switches, are opened. |
|
2. | Ensure all anchor bolts and any required seismic bracing is properly | ❐ |
| tightened and in place. |
|
3. | Remove the wiring access panels and front covers from the AC | ❐ |
| Interface/Transformer assembly and Main Inverter Inductor Enclosure. |
|
4. | Remove the latches and open the doors of the Main Inverter Enclosure, | ❐ |
| the AC and DC Interface Enclosures, and Communication Enclosure |
|
| and inspect. |
|
5. | Verify all wire conduit fittings and connections are properly tightened. | ❐ |
Visual Inspection of Electrical Connections
To perform a visual inspection of the PV100S electrical connections:
1. | Ensure that the AC and DC disconnect switches, as well as any utility | ❐ |
| interconnect circuit breakers or main disconnect switches, are opened. |
|
2. | Ensure all conductors and wiring connections interfacing with the | ❐ |
| PV100S are tightened to the correct torque value. |
|
| For specific torque values, see Table |
|
| Bolt Size, and Torque Values” on page |
|
| Terminal Wire Gauge, Bolt Size, and Torque Values” on page |
|
3. | Verify AC power conductors terminated at | ❐ |
| within the Main Inverter Enclosure are terminated correctly and |
|
| properly sequenced. |
|
4. | Verify the AC power conductors terminated at | ❐ |
| within the AC Interface Enclosure are terminated correctly and properly |
|
| sequenced. |
|
5. | Verify DC power conductors terminated at | ❐ |
| the DC Interface Enclosure are terminated correctly and properly |
|
| polarized. |
|
152315 Rev C |