Manuals
/
Xantrex Technology
/
Computer Equipment
/
Power Supply
Xantrex Technology
PV100S-480
installation manual
This page intentionally left blank
Models:
PV100S-480
1
78
90
90
Download
90 pages
29.08 Kb
75
76
77
78
79
80
81
82
<
>
Specification
Install
Schematics
Wiring Requirements
Dimension
Pots Access
Operational Safety Procedures
Safety
Communication Features
On/Off Switch
Page 78
Image 78
Schematics
This page intentionally left blank.
A–2
152315 Rev C
Page 77
Page 79
Page 78
Image 78
Page 77
Page 79
Contents
PV100S 100 kW Grid-Tied Photovoltaic Inverter
Page
PV100S 100 kW Grid-Tied Photovoltaic Inverter
Date and Revision
Audience
Purpose
Scope
Organization
Conventions Used
Following conventions are used in this guide
Abbreviations and Acronyms
Related Information
Page
Important Safety Instructions
Safety Equipment
General Safety Precautions
Personal Safety
Wiring Requirements
Safety
Operational Safety Procedures
Lockout and Tag
De-Energize/Isolation Procedure
Interconnection Standards Compliance
To isolate the PV100S
Xii
Contents
Installation
Schematics
Verification
Tables
Xvi
Figures
Figures
Introduction
Description of the PV100S
1Dimensions Not to scale
System Specifications
Electrical Specifications
System Ground Requirements
Environmental Specifications
3Environmental Specifications
Main Enclosure Door Interlock Switch
Operator Interface Controls
On/Off Switch
3On/Off Switch
Communication Features
AC and DC Disconnect Switches
System Status and Fault Reporting
Data Logging
Communication Methods
Universal Front Panel Control Unit Ufcu
PC Connection Methods
6PC Connections in the Communications Enclosure
Pots Access
Ethernet LAN Access
Planning
Overview of PV100S Installation
Ventilation and Serviceability Requirements
PV Planning
Communication Requirements
Ground Requirements
System Neutral Requirements
Utility Side Isolation Transformer Requirements
Electrical Diagrams and Schematics
Model PV100S-480
Model PV100S-208
Layout Options
1PV100S Layout Option a
2PV100S Layout Option B
Conduit Penetration
3Conduit Entry Figure Reference
15 cm 12 30 cm
10.5 27 cm
Conductor and Conduit Sizing
To calculate the proper conduit size
Determine the required cable ampacity
Size the cable
Size the conduit
Anchoring the PV100S
29 73.7 cm 16 ¼ 40.6 cm
10AC Interface/Transformer Anchor Bolt Pattern Not to Scale
Installation
Equipment Required
Unloading
Moving the PV100S
Unpacking the PV100S
To move the PV100S using a forklift
Removing the Pallet and Moving the PV100S
Mounting and Anchoring the Units
To mount and anchor the PV100S
Opening or Closing Access Doors
To lock or unlock the front door on the main inverter
To Open Access Door
To Close Access Door
7Transformer Access Panels
Conduit Installation
To install the conduits
Wiring General
Overcurrent Protection
Conductor Termination
Wire Gauge and Torque Requirements
Grounding
System Neutral Requirements
Utility Side Isolation Transformer Requirements
Wiring Specific
AC Connections
13Tie-wraps on the AC Sense Harness
15AC Terminal Connections in the Main Inverter Enclosure
17Connecting the AC Sense Harness
To connect the utility service to AC Interface Enclosure
18AC Terminal Connections from the Utility
PV Array Connections
19PV Array Cable Routing and Terminations
PC Communications
To connect a personal computer using the Pots Connection
Establishing a Pots Connection
Establishing Wireless Connection
To connect a personal computer using the GSM Wireless modem
If connecting the PC directly to the inverter
Direct Connection
22Direct Connect Installation
Verification
Verification Procedure Summary
Visual Inspection of Mechanical Connections
Visual Inspection of Electrical Connections
Visual Inspection, Isolation Transformer Wye/Wye
Corrective Action
Perform after initial inspection if required
Schematics
This page intentionally left blank
Figure A-1Electrical Diagram sample
Schematics
Appendix a
Schematics
Appendix a
Schematics
Appendix a
This page was intentionally left blank
Index
IX-2 Rev C
Page
Xantrex Technology Inc
Top
Page
Image
Contents