42

Chapter 5 Operating Instructions

Follow previous 5.2 Start-UP Procedure (Into Normal Mode) and observe at the end of the procedure that bypass LED on the operator control and display panel remains green (indicating that the load is supplied by the bypass mains).

The UPS is now operating in ECO mode

5.4 Battery Test Mode Procedures

The Battery test mode procedures transfer the UPS into shared source mode wherein approximately 15% of the load power is supplied by the battery and the balance by the AC input mains.

Battery test type and preconditions

1. There are two battery tests to select from:

zBattery maintenance test: verifies the battery integrity and leads to the battery being partly discharged (20%).

zBattery capacity test: verifies precisely the battery capacity and leads to the battery being fully discharged (until Battery low prewarning alarm)

2.The tests can be carried out from the operator control and display panel of the UPS by the operator when the following conditions are satisfied:

zThe load must be between 20% and 80% of rated UPS capacity.

zThe battery must have been float charging for 5 hours or more.

The battery test procedures are password controlled and menu driven. The test is immediately terminated in the event of a battery or a mains failure and the total load power is supported from the remaining source without interruptions.

Test procedure

1.Select the Command menu on the LCD screen on the operator control and display panel of the UPS. Use the right or left arrow key to navigate to the Command menu.

2.Select the desired test (the Battery maintenance test or Battery capacity test option).

Use the Shift key (F1), up and down arrow keys (F2, F3) to highlight the desired test. Press the Enter key (F4).

When prompted, enter each password digit with up arrow (F2) and use right arrow (F3) to access next field. Press the Enter key (F4) when all digits have been entered.

3. Wait until the test completes.

This test updates the battery information, including the battery autonomy time (battery discharge duration during AC input failure) and the battery aging coefficient (battery capacity percentage when compared to a new battery).

4. Stop the test.

If required, the test may be stopped before completion by selecting Stop testing on the Command menu.

5.5 System Test Procedure

The UPS test procedure checks the control functions of the UPS, the mimic flow chart LEDs and the audible alarm. This self-test is password controlled and menu driven. It can be carried out from the operator control and display panel by the operator and takes 5 seconds.

Test procedure:

1.Select the Command menu on the LCD screen on the operator control and display panel of the UPS. Use the right or left arrow key to navigate to the Command menu.

2.Select the System test option.

Use the Shift key (F1) and up and down arrow keys (F2, F3) to highlight the desired test. Press the Enter key (F4).

When prompted, enter each password digit with up arrow (F2) and use right arrow (F3) to access next field. Press the Enter key (F4) when all digits have been entered.

HIPULSE U UPS Single Module And “1+N” (Expandable) 160/200/300/400kVA User Manual

Image 52
Contents Version V1.0 Revision date April 29 31011661Page Page Manual Describes The Following Equipment Safety Precautions Page Contents Page Page Page Features General DescriptionDesign Concept Hipulse U Module DesignBypass Supplies System Control PhilosophyNormal operation Mains failureECO Mode For Single UPS Only Operation Mode UPS Power Switch ConfigurationBattery Circuit Breaker Battery Temperature CompensationAuto-restart mode Bypass modeMaintenance mode Source Share modeEnvironmental Considerations Mechanical InstallationUPS Location Mechanical Considerations Installation Drawings Preliminary Checks1905 Front view Air inlet Top view Air615 556 1061 1210 1251 Top view Air outlet651 761 800 843 Front view 1903 Air 1641Side view Back view Top view Air outlet104 424 155 Top view Air outlet 1685 1626 Cable access Base view415 556 1451 1600 1641 Front正view视图 RemovableGrille 2 pcs Removable Grille 2 pcsFront view 正视图 Ventilation after being installedAir inlet 进风口 Grille Electrical Installation Power CablingSystem Configuration Cable RatingSafety Earth General NotesCable Connections Protective DevicesCabling Procedure UPS batteryNm M10 bolts. Ensure Correct Phase Rotation Output of the systemRectifier Bypass Earth Auxiliary Terminal blockConnections Distance From Floor To Connection Point Distance from floor to connection pointControl Cabling Monitoring Board PortsDry contact input ports CardDescription of maintenance bypass cabinet port Dry contact output portAuxiliary DC power output port EPO input portCommunication ports Description of dry contact output portBattery Control Communication port resource deployment tableConnecting Main Cabinet And Side Cabinet Connecting Power CablesConnecting Signal Cables Port side cabinet Cable No. main cabinetW45 W41-5ULW36CSA8 LED Indicators Description of LED indicatorsOperator Control And Display Panel IntroductionControl Buttons BuzzerLCD And Menu Keys System information window Detailed Description Of Menu ItemsMenu window and UPS data window Adjusts the graphic LCD monitor contrast for best viewing 中文/English Press the Enter key F4Use the Shift key F1 and up and down arrow keys F2, F3 to Previously setExplanation This setting applies to RS485 communication Communication mode RS232 Reserved Callback timesBattery capacity test More OK or FaultLCD Screen Types EPO ButtonStart Screen Current record windowPrimary Screen Default ScreenHelp Screen Prompt Window UPS Alarm Message List Alarm message Description Ongoing update of rectifier firmwareOngoing update of inverter firmware Ongoing update of monitor firmwareCan also leads to the alarm Unit over load timeoutIs found to be in error Inverter overtempTo this Power Switches Operating InstructionsService socket Designed for use in UPS Service, cannot be used for other purposesStart-Up Procedure Into ECO Mode Start-Up Procedure Into Normal ModeLED status Battery Test Mode Procedures System Test ProcedureBattery test type and preconditions Test procedureShutdown Procedure Complete UPS And Load Shutdown Maintenance Bypass Procedure And UPS Shut DownLoad equipment is not protected from AC supply aberration EPO Procedure UPS Reset ProcedureLanguage Selection Auto RestartChanging The Current Date And Time Safety BatteryUPS Batteries Installation Design Considerations Battery Installation And MaintenanceTemperature Considerations Battery PopulationBattery Protection Battery ConnectionBattery Installation Connecting The BatteryBCB Box Optional 455738 654 1042660 Battery Temperature Sensor OptionalФ13 Knockout 1+N System Installation Procedures +N SystemGeneral Preliminary ChecksCabinet Installation Power Cables1+N System Operating Instructions Control CablesMaintenance Bypass Procedure And UPS Shut Down Start-Up Procedure Into Normal ModeInsertion Procedure Of One Module In a Parallel System Dual Bus System Installation Procedures Shutdown Procedure Complete UPS And Load ShutdownBypass suppl y Input rectifierDB9-DB9 0411533804115339 04116100 15m DB25-DB25LBS cable Parallel board Board LBS cableParallel cable UPS unit UPS parallel system Parallel并机board板Specifications Mechanical CharacteristicsElectrical Characteristics Input Rectifier Conformity And StandardElectrical Characteristics DC Intermediate Circuit Electrical characteristics DC intermediate circuitElectrical Characteristics Inverter Output Electrical Characteristics Bypass Input MainsElectrical characteristics inverter output Electrical characteristics bypass input mainsElectrical Characteristics System Performance Electrical Characteristics ECO ModeElectrical characteristics system performance Electrical characteristics ECO modeService & Maintenance UPS Key Components And Their LivesLives And Recommended Replacement Time Of Key Components Lifves and recommended replacement time of key componentsReplacing Fuses Key components Life expectancyAppendix 1 Transportation Restraints Removing Procedures 螺Screw钉 Amplified viewM10螺bolt栓 M12螺bolt栓 Restraint300kVA UPS Transportation Restraints Removing Procedures Output 输出变压器 transformer Phase-shifting aAmplifiedA处放大图view M10bolts螺栓 Output 输出变压器 transformerPhase 移相-shifting 变压 器 Open the front door RemoveOpen thebackdoorpanel400kVA UPS Transportation Restraints Removing Procedures Installation hole coversTransportation restraint Bolt Phase-shifting Bolt 2 pcsPhase-shifting transformer