e. If the UPS Bypass line is available, but not yet supplying power to the load, close the circuit breakers (external to the UPS) required to provide power to the critical load equipment. Follow the three steps shown below.
! CAUTION
Be sure to operate Maintenance Bypass circuit breakers in the proper sequence.
1.Verify the Bypass Input Breaker (BIB) and System Bypass circuit breakers are closed.
2.Close the Maintenance Isolation Breaker (MIB).
3.Open the Maintenance Bypass Breaker (MBB).
Observe the Monitor/Mimic Display screen to confirm that the UPS Bypass line is energized and sup- plying power to the critical load equipment.
At the System Control Cabinet (SCC), press the Select pad to put the Master Menu on the LCD. Move the highlighted cursor to
Perform a module
Figure 64 SCC start-up procedures screen
SELECT : MASTER MENU
© 1989-2003
START-UP PROCEDURES
1.Wait approximately two (2) minutes before attempting any other action .
2.Select "SYSTEM CONFIGURATION" screen to verify that the correct model number is displayed.
3.Go to the modules(s) and follow the module "STARTUP PROCEDURES".
4.Select "MONITOR/MIMIC" screen, verify that the output voltages are at the proper nominal level and correct number of modules online is displayed.
5.If the bypass or static switch breakers are open, refer to
6.System is now ready to assume load. Select "LOAD TRANSFER PROCEDURES" screen for this procedure.