Dukane iQ Series user manual Start-up Sequence, Starting a Weld Cycle, Stopping a Weld Cycle

Page 25

Section 4 – Controls and Connections

Start-up Sequence

After all connections have been completed.

1.Push the Power Switch to ON (Figure 4-2).

The generator performs a self-diagnostics sequence.

2.The Power-up screen appears briefly - Figure 4-3.

3.The next screen is an Operate screen ready for a new weld to be done. The display shows:

The setup used for the last weld, and zeros for any weld parameters.

See Figure 4-3A.

Starting a Weld Cycle

1.If the generator is not powered, press its Power Switch/Circuit Breaker to the ON position.

2.Select the setup you want to use, if appropriate.

3.Apply the probe tip to the components to be ultrasonically joined, and press the hand probe’s trigger switch to activate ultrasound.

4.After meeting the weld parameters (and with the Hold time set to zero) - in either Manual, Time or Energy modes - an internal alarm beeps once after the weld setting is met, or after the trigger switch is released.

Depending on optional customer OUTPUTS connections - System Outputs, Page 14 - external audible or visual alerts can be activated as well.

5.Release the probe’s activation switch (trigger), and if appropriate, apply pressure while an optional Hold time elapses. The generator signals when that period is over by sounding an audible alert.

The user can release the activation switch during the Hold time, but there will not be an audible beep until the preset Hold time ends.

Push ON

Push OFF

 

Figure 4-2Power Switch

 

Software

DUKANE

Current

Setup

 

 

version

iQ Hand Probe Setup #1

 

xxxxxxxxx

Website

 

 

xxxxxxx

 

Address

MB FPGA

http://www.dukcorp.com

 

version

Figure 4-3Power-up Screen

 

 

 

Weld by Time

Weld Time 0.000 S

Weld Energy 0 J

#1

Figure 4-3AOperate Screen Appears After Power-up

Stopping a Weld Cycle

1.Release the hand probe’s activation switch (trigger) to abort a weld cycle and stop ultrasound.

2.In addition, press the generator’s Power Switch/ Circuit Breaker to the OFF position to power down the generator.

NOTE

The system will not beep as described here if the Audible Alarm is OFF.

See Hardware Settings, Page 27 to learn how to turn the Alarm ON or OFF.

Dukane Manual Part No. 403-577-01

Page  19

Image 25
Contents User’s Manual Copyright Revision Revision HistorySummary Date This page intentionally left blank Contents This page intentionally left blank Introduction SectionThis page intentionally left blank Read This Manual First General User InformationDrawings and Tables System Overview Key FeaturesGenerator Hand ProbesHealth and Safety This page intentionally left blank Plastics Health Notice General ConsiderationsDomestic Power Grounding Electrical SafetyInternational Power Grounding Unpacking Placing RFI Grounding Connnecting Cables InstallationThis page intentionally left blank Placing UnpackingRFI Grounding AC Power Inlet Connecting Cables Quick Start Guide200/240 Volt Systems Power CordsUltrasound Output Pin 2 Any Fault Alarm Pin 1 End of Weld AlarmSystem Outputs Optional Connections Pin 0V Output CommonControls This page intentionally left blank Front Panel Overview Power Switch/Circuit BreakerControl Keys Arrow Keys Power Bar Graph+ and Keys System LCD DisplayStarting a Weld Cycle Start-up SequenceStopping a Weld Cycle Manual Weld LCD Display OverviewSetup Maintenance Process Control SettingsThis page intentionally left blank Select the Welding Mode Process Controller SettingsNavigating to Manual Mode Navigate to Time ModeNavigating Through the Modes Time keyKey Navigate to Energy ModeHold Amplitude AdjustmentHardware Settings System Information Hardware Settings, AdvancedSystem Information Free Run Frequency Advanced Settings40 % Introduction Setup MaintenanceNavigating Selecting a Setup Saving the Current SetupDeleting a Setup This page intentionally left blank Probes and Probe Stacks This page intentionally left blank Operating Notes Ultrasonic Probe OverviewCompressed Air Fitting In continuous duty Theory of Operation Ultrasonic Horn Attaching a Replaceable Tip to a Horn Stack AssemblyAttaching the Mounting Stud to a Horn or a Booster 5Stack Assembly Procedure In-lb Ft-lb KHz Stack Disassembly Removing the Mounting Stud from a Horn or Booster Booster Notes How to Tell the Booster Input End from the OutputTroubleshooting This page intentionally left blank No Ultrasonic Output System Power Output LevelWeak Welds Welding ProblemsInconsistent Welds Generator Fault Status Screens Manual Mode Pop-up Fault Status ScreensProcess Fault Status Screens Time and Energy Modes Options This page intentionally left blank IQ Hand Probe Options Foot Switch Kit Part NoBuzzer Kit Part No This page intentionally left blank Specifications This page intentionally left blank 1Generator Outline Drawing 2Probes Outline Drawings and Dimensions Operating Environment WeightsAC Power Requirements CE Marking Regulatory Agency ComplianceThis page intentionally left blank Outputs Interface This page intentionally left blank IQ Hand Probe Generator Rear Panel Detail This page intentionally left blank Contacting Dukane This page intentionally left blank Contacting Dukane Intelligent Assembly SolutionsIdentify Equipment This page intentionally left blank Appendices This page intentionally left blank Front Panel List of FiguresDescription List of TablesDukane ISO Part No - 577- 01