Lennox International Inc SL280UH090V36B 20 X 25 X, Furnace Front, Indoor AIR, Return AIR Base

Page 10

Return Air −− Upflow Applications

Return air can be brought in through the bottom or either side of the furnace installed in an upflow application. If the furnace is installed on a platform with bottom return, make an airtight seal between the bottom of the furnace and the platform to ensure that the furnace operates properly and safely. The furnace is equipped with a removable bottom panel to facilitate installation.

Markings are provided on both sides of the furnace cabinet for installations that require side return air. Cut the furnace cabinet at the maximum dimensions shown on page 2.

NOTE − 60C and 60D units that require air volumes over 1800

cfm (850 L/s) must have one of the following:

1 − Return air from single side with transition which will accommodate 20 x 25 x 1 in. (508 x 635 x 25 mm) clean- able air filter. (Required to maintain proper air velocity.) See figure 8.

2 − Return air from single side with optional RAB Return Air Base. See figure 9.

3 − Return air from bottom and one side.

4 − Return air from both sides.

5 − Return air from bottom.

Refer to Engineering Handbook for additional information.

Single Side Return Air

(with transition and filter)

20” X 25” X 1”

(508mm X635mm X 25mm)

Cleanable Filter

Return Air

Plenum

AIR FLOW

Transition

FIGURE 8

Optional Return Air Base

(Upflow Applications Only −− For use with A, B, C and D cabinets)

 

FURNACE

 

 

FRONT

 

 

 

IF BASE

3−1/4

 

 

IS USED

 

 

WITHOUT

(83)

 

INDOOR AIR

IAQ CABINET,

 

 

A SINGLE

 

 

 

RETURN AIR

 

 

 

PLENUM

 

AIR FLOW

 

MUST

 

 

COVER BOTH

 

 

 

 

 

 

UNIT AND

 

 

 

RETURN

 

 

 

AIR BASE

7−1/4

 

 

OPENINGS

(184)

14−1/2” (368) A Width (65W75)

OPTIONAL

 

 

17−1/2” (446) B Width (50W98)

RETURN AIR BASE

 

21”− (533) C Width (50W99)

24−1/2”− (622) D Width (51W00)

1 23 (584)

 

 

 

 

Overall

 

 

 

 

 

 

 

 

 

(Maximum)

1 Minimum

 

 

 

11 (279)

 

1 Unit side return air

2 Maximum

14 (356)

 

Opening

 

 

 

 

 

 

 

 

 

 

 

 

 

5−5/8

SIDE RETURN

 

 

 

 

AIR OPENINGS

 

 

 

(143)

 

 

 

(Either Side)

 

 

 

 

 

 

 

 

 

 

 

 

23

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(584)

 

 

 

 

 

 

 

 

26−7/8

 

 

 

 

 

 

(683)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SIDE VIEW

 

 

 

122−7/16

(570)

Overall

(Maximum)

3/4

(19)

NOTE− Optional Side Return Air Filter Kits are not for use with Optional Return Air Base.

1Both the unit return air opening and the base return air opening must be covered by a single plenum or IAQ cabinet.

Minimum unit side return air opening dimensions for units requiring 1800 cfm or more of air (W x H): 23 x 11 in. (584 x 279 mm). The opening can be cut as needed to accommodate plenum or IAQ cabinet while maintaining dimensions shown.

Side return air openings must be cut in the field. There are cutting guides stenciled on the cabinet for the side return air

opening. The size of the opening must not extend beyond the markings on the furnace cabinet.

2To minimize pressure drop, the largest opening height possible (up to 14 inches) is preferred.

FIGURE 9

Page 10

Image 10
Contents Installation Instructions SL280UHV Table of ContentsSide Return Air Opening Unit Dimensions − inches mmReturn air from both sides Either SideParts Arrangement Access Panel Blower AssemblySight Glass SL280UHV Gas Furnace Safety InformationShipping and Packing List Air Handler Unit Use of Furnace as Construction HeaterGeneral EvaporatorCombustion, Dilution & Ventilation Air Equipment in Confined Space ALL AIR from InsideEquipment in Confined Space Equipment in Confined Space ALL AIR from OutsideEquipment Confined Space ALL AIR from Outside Bottom Setting EquipmentBlower Motor Rigid LEG Indoor AIR 20 X 25 XFurnace Front Return AIR BaseEnd Bottom Horizontal Application Installation Clearances Top LeftRight Typical Horizontal ApplicationFilters Duct SystemTop Vent Discharge VentingUpflow Position Left Side Vent DischargeHorizontal Right Position Horizontal Left PositionSide Vent Discharge Sticker Common Venting Using Metal−Lined Masonry ChimneyDisconnected Vent Vent PipeVent Connector Through an unused masonry chimney flue is not considered102 127 −1/2 152 178 10−1/2 MIN MAX Feet FAN + FAN FAN + NAT 130 Carbon Monoxide Poisoning Hazard Gas Piping Ers or straps. Install a drip leg in vertical pipe runs to− In some localities, codes may require the installation Every 8 to 10 feet 2.44 to 3.01 m with suitable hangLeft−Side Air Discharge Horizontal ApplicationRight−Side Air Discharge Electrostatic Discharge ESD Interior MAKE−UP BOX InstallationElectrical BOXNon−Communicating CommunicatingIcomfortt Integrated Control Outdoor Unit Icomfort Touch 120V Connections NON−COMMUNICATING System WiringCommunicating System Wiring ApplicationsDIP Switch Settings and On−Board Links See figure OFF Single Stage Thermostat w Dual fuel capa Bilities SL280UHV Schematic Wiring Diagram Typical SL280UHV Field Wiring Diagram RS−BUS Link TB82, future use Integrated Control+ = Data High Connection − = Data LOW Connection −10% approx OFF On−Board Links 940 1045985 880SL280UH090V36B Blower Performance less filter 1155 12801220 10951170 12951235 11101165 13601230 11001160 12901225 1380+18% 1605 SL280UH110V60C Blower Performance less filter +18% 1785 SL280UH135V60D Blower Performance less filter Operating Sequence Compressor Thermostat energizes Y2White Rodgers GAS Valve For Your Safety Read Before LightingUnit Start−Up Honeywell GAS ValveProper Combustion Gas Pressure AdjustmentGAS Meter Clocking Chart DialHigh Altitude Other Unit Adjustments Heating Sequence of OperationHeating Operation with Single Stage Thermostat Heating Operation with TWO−STAGE ThermostatSEC Service Electrical SHOCK, Fire Or Explosion Hazard11− Back wash using steam. Begin from the burner opening SL280UHV BURNER, Combustion AIR Inducer Assembly13− To clean the combustion air inducer visually inspect 17− Reinstall burner box, manifold assembly and burner boxSL280UHV NOX Inserts Planned Service Repair Parts ListIntegrated Control Diagnostic Modes Integrated Control Diagnostic CodesPower at the thermostat. Alert stops all services Normal operation 5 seconds after fault recoveredFurnace / air handler. Clears after fault recovered Equipment is unable to communicate. IndicatesControl will still operate on default parameter set Reconfigure the system. Replace control if heatingMissioning and Execute ’Set Factory Default mode’ Ate feature will be set as ’installed’ and that couldFault is cleared Low pressure switch failed openSumes normal operation after fault is cleared Tion after fault is clearedSoft lockout or reset Open or not within specifications −hour soft lockOut. Clears when flame has been proven stable To flame failureError after current is sensed in both RUN Pair/add duct. Cleared after the current service deIs not running. Check power to outdoor unit. Clears Vice is removed, or after power resetSor run cycle, or after power reset Program Unit Capacity/Size Mode FinishedTroubleshooting Heating Sequence of Operation Call for FIRST−STAGE HeatCall for SECOND−STAGE Heat Call for Heat SatisfiedCall for Heat Satisfied FIRST−STAGE Heat SECOND−STAGE Heat 2ND Stage HeatTroubleshooting Cooling Sequence of Operation Call for CoolingTroubleshooting Continuous Fan Sequence of Operation Call for FAN