Lennox International Inc
SL280UH070V36A, SL280UH090V48B SL280UHV Schematic Wiring Diagram
Repair Parts List
GAS Meter Clocking Chart
Fault is cleared
Communicating System Wiring
Dimension
Soft lockout or reset
Vent Connector
Access Panel Blower Assembly
Other Unit Adjustments
Setting Equipment
Page 33
SL280UHV Schematic Wiring Diagram
FIGURE 32
Page 33
Page 32
Page 34
Image 33
Page 32
Page 34
Contents
Table of Contents
Installation Instructions SL280UHV
Return air from both sides
Unit Dimensions − inches mm
Side Return Air Opening
Either Side
Access Panel Blower Assembly
Parts Arrangement
Sight Glass
Safety Information
SL280UHV Gas Furnace
Shipping and Packing List
General
Use of Furnace as Construction Heater
Air Handler Unit
Evaporator
Combustion, Dilution & Ventilation Air
Space ALL AIR from Inside
Equipment in Confined
Equipment in Confined Space ALL AIR from Outside
Equipment in Confined Space
Equipment Confined Space ALL AIR from Outside
Setting Equipment
Bottom
Blower Motor Rigid LEG
Furnace Front
20 X 25 X
Indoor AIR
Return AIR Base
Right
Horizontal Application Installation Clearances Top Left
End Bottom
Typical Horizontal Application
Duct System
Filters
Upflow Position
Venting
Top Vent Discharge
Left Side Vent Discharge
Horizontal Left Position
Horizontal Right Position
Side Vent Discharge
Disconnected Vent
Common Venting Using Metal−Lined Masonry Chimney
Sticker
Vent Pipe
Through an unused masonry chimney flue is not considered
Vent Connector
102 127 −1/2 152 178 10−1/2
MIN MAX
Feet
FAN + FAN FAN + NAT
130
Carbon Monoxide Poisoning Hazard
− In some localities, codes may require the installation
Ers or straps. Install a drip leg in vertical pipe runs to
Gas Piping
Every 8 to 10 feet 2.44 to 3.01 m with suitable hang
Horizontal Application
Left−Side Air Discharge
Right−Side Air Discharge
Electrical
Interior MAKE−UP BOX Installation
Electrostatic Discharge ESD
BOX
Communicating
Non−Communicating
Icomfortt Integrated Control Outdoor Unit Icomfort Touch
Communicating System Wiring
NON−COMMUNICATING System Wiring
120V Connections
Applications
DIP Switch Settings and On−Board Links See figure
OFF
Single Stage
Thermostat w Dual fuel capa Bilities
SL280UHV Schematic Wiring Diagram
Typical SL280UHV Field Wiring Diagram
Integrated Control
RS−BUS Link TB82, future use
+ = Data High Connection − = Data LOW Connection
−10% approx
OFF
On−Board Links
985
1045
940
880
SL280UH090V36B Blower Performance less filter
1220
1280
1155
1095
1235
1295
1170
1110
1230
1360
1165
1100
1225
1290
1160
1380
+18% 1605
SL280UH110V60C Blower Performance less filter
+18% 1785
SL280UH135V60D Blower Performance less filter
Operating Sequence
Thermostat energizes Y2
Compressor
Unit Start−Up
For Your Safety Read Before Lighting
White Rodgers GAS Valve
Honeywell GAS Valve
GAS Meter Clocking Chart
Gas Pressure Adjustment
Proper Combustion
Dial
High Altitude
Heating Sequence of Operation
Other Unit Adjustments
Heating Operation with TWO−STAGE Thermostat
Heating Operation with Single Stage Thermostat
SEC
Electrical SHOCK, Fire Or Explosion Hazard
Service
13− To clean the combustion air inducer visually inspect
SL280UHV BURNER, Combustion AIR Inducer Assembly
11− Back wash using steam. Begin from the burner opening
17− Reinstall burner box, manifold assembly and burner box
SL280UHV NOX Inserts
Repair Parts List
Planned Service
Integrated Control Diagnostic Codes
Integrated Control Diagnostic Modes
Furnace / air handler. Clears after fault recovered
Normal operation 5 seconds after fault recovered
Power at the thermostat. Alert stops all services
Equipment is unable to communicate. Indicates
Missioning and Execute ’Set Factory Default mode’
Reconfigure the system. Replace control if heating
Control will still operate on default parameter set
Ate feature will be set as ’installed’ and that could
Sumes normal operation after fault is cleared
Low pressure switch failed open
Fault is cleared
Tion after fault is cleared
Out. Clears when flame has been proven stable
Open or not within specifications −hour soft lock
Soft lockout or reset
To flame failure
Is not running. Check power to outdoor unit. Clears
Pair/add duct. Cleared after the current service de
Error after current is sensed in both RUN
Vice is removed, or after power reset
Sor run cycle, or after power reset
Finished
Program Unit Capacity/Size Mode
Call for FIRST−STAGE Heat
Troubleshooting Heating Sequence of Operation
Call for Heat Satisfied
Call for SECOND−STAGE Heat
2ND Stage Heat
Call for Heat Satisfied FIRST−STAGE Heat SECOND−STAGE Heat
Call for Cooling
Troubleshooting Cooling Sequence of Operation
Call for FAN
Troubleshooting Continuous Fan Sequence of Operation
Related pages
All Diagram page
Electrical Diagram for Cecilware EL-1636
Broiling rack position chart for Whirlpool RF361 BXD
Quick Meals chart for Frigidaire FGMV205KB
Typical AMD Athlon XP Processor Model 8 System Block Diagram for AMD 8
Cycle Chart for GE GSD1200G
Wiring Diagram IID Low NOx for Raypak P-R185B to R-P405B, C-R185B to C-R405B, P-R185BL to P-R405BL, C-R185BL to C-R405BL
Diagram for Impex CG 1400
Features Diagram for Magic Chef MCB770B
Charging Chart Unit 48/50MP90P for Carrier MPE62L-10R
See chart on for Fitness Quest 6.5r
How does the
measured fill refrigerator
feature work?
Top
Page
Image
Contents