Installation

Dual-Circuit Condensing Units: Evaporator Coil with Four Distributors (see Figure 39)

Figure 39. Dual-circuit evaporator coil with four distributors

1Pitch the liquid line slightly—

1 inch/10 feet [1 cm/3 m]—so the refrigerant drains toward the evaporator.

2Provide one expansion valve per distributor.

3Slightly pitch the outlet line from the suction header toward the suction riser—that is, 1 inch/

10 feet [1 cm/3 m] in the direction of flow. Use the tube diameter that matches the suction-header connection.

4Arrange the suction line so the refrigerant gas leaving the coil flows downward, past the lowest suction-header outlet, before turning upward. Use a double- elbow configuration to isolate the thermal expansion valve bulb from other suction headers.

5For horizontal tubing, use the tube diameter recommended by the condensing unit manufacturer.

6For the vertical riser, use the tube diameter recommended by the condensing unit manufacturer. Assure the top of the riser is higher than the evaporator coil.

7Pitch the suction line slightly—

1 inch/10 feet [1 cm/3 m]—so the refrigerant drains toward the evaporator.

8Insulate the suction line.

CAH-SVX01A-EN

9The top of the Circuit 1 suction riser must be higher than the bottom evaporator coil. Use the tube diameter recommended by the condensing unit manufacturer for the riser.

10The top of the Circuit 2 suction riser must be higher than the top evaporator coil. Use the tube diameter recommended by the condensing unit manufacturer for the riser.

39

Image 39
Contents July Custom Climate Changer Air HandlersCAH-SVX01A-EN Protecting Environment Unit DescriptionContents Factory-Mounted Controls Wiring Sizes ConnectionsOperating Environment ControlsUltraviolet UV Germicidal Irradiation Lights optional Use Canvas Only Receiving ChecklistResolving Shipping Damage Job Site Storage RecommendationsOutdoor Storage Considerations Pre-Installation Requirements General StoragePreparing the Unit Site Long-Term StorageTypical Curb Installation Checklist Roof Curb InstallationGeneral Lifting Considerations Lifting and RiggingAssembly Hardware Unit AssemblyJoining Sections Edge-to- Edge TCP Model Assembly InstructionsTCP base assembly TCP Base Section Assembly TypicalTCP Outdoor Roof Section Assembly Typical Installation TCP Wall Section Assembly TypicalInstallation TCP Indoor Roof Section Assembly Typical Indoor Roof Assembly CompleteBase to Wall Assembly Complete Joining sections Edge to Edge TCC Model Assembly InstructionsApply butyl tape to shipping splits Add caulk along the seam Join internal shipping split frame Installation TCC indoor roof sections assembly typical TCC wall sections assembly typicalJoin outdoor roof panels at the seams Installation TCC outdoor roof sections assembly typicalTrim roof joint strip Fans Component Installation RequirementsIsolator Adjustment Duct ConnectionsTraq Dampers Control DampersMagnahelic Air Filter Gage Front Load Filters Installation Air FiltersBag or Cartridge Filters Outdoor Unit Weather HoodsPrevent Coil Damage Use a Backup WrenchCoil Piping Connections General RecommendationsWater Damage Installation Drain Pan TrappingCoil Damage Installation Steam Coil PipingInstallation Typical piping for type 5W one-row water coil Water Coil PipingLiquid Lines Installation Refrigerant Coil PipingType F refrigerant coil with packed elbow Valve DamageSingle-circuit evaporator coil with one distributor Examples of Field-Installed Evaporator PipingSingle-circuit evaporator coil with two distributors Single-circuit evaporator coil with four distributors Dual-circuit evaporator coil with two distributors Dual-circuit evaporator coil with four distributors Dual-circuit evaporator coil with eight distributors Capacitors WiringHazardous Voltage with Use Copper Conductors OnlyExternal Insulating Requirements Junction box mounting and wiring detailsMotor-Related Checks Pre-Startup ChecklistFan-Related Checks Coil-Related Checks Proper Water TreatmentUnit Operation General ChecksCalculate Motor Voltage Imbalance Tension Belts Correctly Startup Tension the Fan BeltStartup Determine Fan Speed Sheave AlignmentMultibelt Check Routine Maintenance Front Load Filters Air FiltersThrowaway Filters Permanent FiltersBearing Set Screw Alignment Inspecting and Cleaning FansDrain Pans FansFan Motor Inspection Fan Bearing LubricationRefrigerant Coils CoilsSteam and Water Coils Type K Cooling CoilsMoisture Purge Cycle Internal Insulation Ultraviolet UV Germicidal Irradiation Lights Replacement of ultraviolet bulbsTroubleshooting Alignment section on CAH-SVX01A-EN CAH-SVX01A-EN Trane