
Contents |
|
Introduction | 3 |
Unit Description | 3 |
Protecting the Environment | 3 |
Contents | 4 |
General Information | 5 |
Operating Environment | 5 |
Controls | 5 |
Ultraviolet (UV) Germicidal Irradiation Lights (optional) | 6 |
7 | |
Receiving Checklist | 7 |
Resolving Shipping Damage | 7 |
Job Site Storage Recommendations | 7 |
Preparing the Unit Site | 8 |
Roof Curb Installation | 9 |
Installation | 10 |
Lifting and Rigging | 10 |
Unit Assembly | 11 |
TCP Model Assembly Instructions | 12 |
TCC Model Assembly Instructions | 17 |
Duct Connections | 24 |
Component Installation Requirements | 24 |
Coil Piping and Connections | 28 |
Wiring | 41 |
External Insulating Requirements | 42 |
Startup | 43 |
43 | |
Unit Operation | 44 |
Determine Fan Speed | 47 |
Sheave Alignment | 47 |
Multibelt Check | 47 |
Routine Maintenance | 48 |
Air Filters | 49 |
Drain Pans | 50 |
Fans | 50 |
Coils | 52 |
Moisture Purge Cycle | 53 |
Internal Insulation | 54 |
Ultraviolet (UV) Germicidal Irradiation Lights | 55 |
Troubleshooting | 56 |
4 |
|