Trane Custom Climate Changer Air Handlers Startup Tension the Fan Belt, Tension Belts Correctly

Page 45

Startup

Tension the Fan Belt

Check the fan belt tension at least three times during the first days of operation because there is a rapid decrease in tension until the belt settles in (see Figure 46 and Figure 47).

￿WARNING Hazardous Voltage with Capacitors!

Disconnect all electric power, including remote disconnects and discharge all motor start/run capacitors before servicing. Follow proper lockout/tagout procedures to ensure the power cannot be inadvertently energized. For variable frequency drives or other energy storing components provided by Trane or others, refer to the appropriate manufacturer’s literature for allowable waiting periods for discharge of capacitors. Verify with an appropriate voltmeter that all capacitors have discharged. Failure to disconnect power and discharge capacitors before servicing could result in death or serious injury.

CAUTION

Tension Belts Correctly!

Over-tensioning belts can cause damage to bearings, shafts, and drive components. Under tensioning belts is the primary cause of premature belt failure. Belts should not squeal at startup. Recheck belt tension after 8 hours, 24 hours, and 100 hours of operation and monthly thereafter.

Proper belt tension is required to

ensure maximum bearing and drive Figure 47. Belt tensioner component life and is based on

motor horsepower requirement. A label located on the bearing support on the drive side of the unit lists all drive parts, the proper belt tension, and deflection for that tension for the specific drive.

If the drive is changed from the original, proper belt tension can be estimated using Table 3.

The correct operation tension for a V-belt drive is the lowest tension at which the belts will not slip under the peak load conditions. It may be necessary, however, to increase the tension of some drives to reduce excessive belt flopping or to reduce excessive startup squealing.

Figure 46. Belt tension measurement

CAH-SVX01A-EN

45

Image 45
Contents July Custom Climate Changer Air HandlersCAH-SVX01A-EN Protecting Environment Unit DescriptionContents Operating Environment Wiring Sizes ConnectionsControls Factory-Mounted ControlsUltraviolet UV Germicidal Irradiation Lights optional Resolving Shipping Damage Receiving ChecklistJob Site Storage Recommendations Use Canvas OnlyPreparing the Unit Site Pre-Installation Requirements General StorageLong-Term Storage Outdoor Storage ConsiderationsTypical Curb Installation Checklist Roof Curb InstallationGeneral Lifting Considerations Lifting and RiggingAssembly Hardware Unit AssemblyJoining Sections Edge-to- Edge TCP Model Assembly InstructionsTCP base assembly TCP Base Section Assembly TypicalTCP Outdoor Roof Section Assembly Typical Installation TCP Wall Section Assembly TypicalInstallation TCP Indoor Roof Section Assembly Typical Indoor Roof Assembly CompleteBase to Wall Assembly Complete Joining sections Edge to Edge TCC Model Assembly InstructionsApply butyl tape to shipping splits Add caulk along the seam Join internal shipping split frame Installation TCC indoor roof sections assembly typical TCC wall sections assembly typicalJoin outdoor roof panels at the seams Installation TCC outdoor roof sections assembly typicalTrim roof joint strip Isolator Adjustment Component Installation RequirementsDuct Connections FansTraq Dampers Control DampersMagnahelic Air Filter Gage Front Load Filters Installation Air FiltersBag or Cartridge Filters Outdoor Unit Weather HoodsCoil Piping Connections Use a Backup WrenchGeneral Recommendations Prevent Coil DamageWater Damage Installation Drain Pan TrappingCoil Damage Installation Steam Coil PipingInstallation Typical piping for type 5W one-row water coil Water Coil PipingLiquid Lines Installation Refrigerant Coil PipingType F refrigerant coil with packed elbow Valve DamageSingle-circuit evaporator coil with one distributor Examples of Field-Installed Evaporator PipingSingle-circuit evaporator coil with two distributors Single-circuit evaporator coil with four distributors Dual-circuit evaporator coil with two distributors Dual-circuit evaporator coil with four distributors Dual-circuit evaporator coil with eight distributors Hazardous Voltage with WiringUse Copper Conductors Only CapacitorsExternal Insulating Requirements Junction box mounting and wiring detailsFan-Related Checks Pre-Startup ChecklistCoil-Related Checks Proper Water Treatment Motor-Related ChecksUnit Operation General ChecksCalculate Motor Voltage Imbalance Tension Belts Correctly Startup Tension the Fan BeltStartup Determine Fan Speed Sheave AlignmentMultibelt Check Routine Maintenance Throwaway Filters Air FiltersPermanent Filters Front Load FiltersDrain Pans Inspecting and Cleaning FansFans Bearing Set Screw AlignmentFan Motor Inspection Fan Bearing LubricationSteam and Water Coils CoilsType K Cooling Coils Refrigerant CoilsMoisture Purge Cycle Internal Insulation Ultraviolet UV Germicidal Irradiation Lights Replacement of ultraviolet bulbsTroubleshooting Alignment section on CAH-SVX01A-EN CAH-SVX01A-EN Trane