❉
Tools Needed:
Power Drill
7/16” Socket
Driver
Side Lock
Install the side lock on the second section of the door. Secure the lock to the section with (4) 1/4”- 20 x 11/16” self drilling screws. Square the lock assembly with the door section and align with the square hole in the vertical track. The side lock should be spaced approximately 1/8” from the section edge.
IMPORTANT: side locks must be removed or made inoperative in the unlocked position if an operator is installed on the door.
NOTE: After completing this step, continue with step 10 on page 17.
1/8”
(4)1/4”- 20 x 11/16” self drilling screws
INSTALLATION
❉ | DoorMasterTM Bracket | a |
| ||
| DoormasterTM bRACKET/ | |
|
| DRIVE GEAR ASSEMBLY |
Tools Needed: | A |
|
NOTE: When installing a DoorMasterTM |
| |
Power Drill |
| |
operator use the center bracket and |
| |
1/8” Drill Bit | drive gear supplied with your operator |
|
(located in DoorMasterTM package). |
| |
|
|
Slide the DoorMasterTM bracket/drive gear assembly onto the TorqueMaster® Spring Tube, so that the drive gear/ center bracket assembly are in the center of the TorqueMaster® Spring Tube.
| NOTE: After completing this step, | Torquemaster® tube |
| continie with step 19 on page 25. |
|
Tools Needed: | B | b |
Locate the center bracket, mark the |
| |
Power Drill |
| |
header halfway between the flagangles | DoormasterTM | |
1/8” Drill Bit | and level the TorqueMaster® Spring Tube. | bRACKET/ |
| Drill 1/8” pilot holes for the lag screws. | DRIVE GEAR |
7/16” Socket | ASSEMBLY | |
Fasten the metal bracket to the header |
| |
Driver |
| |
using (2) 1/4” x |
| |
|
|
NOTE: After completing this step, continie with step 28 on page 31.
Please Do Not Return This Product To The Store. Contact your local