Wayne-Dalton 9800 Series installation instructions Preparing the Opening

Page 10

P5

 

 

 

 

 

suitable mounting

Preparing the Opening

header board

 

 

 

surface 2” x 6”

2” x 6” lumber

 

 

 

lumber minimum

 

preferred

 

 

 

 

 

Tools Needed:

If you just removed your existing door or you are installing a

 

 

 

 

 

 

new door, complete all steps in PREPARING THE OPENING.

 

 

 

 

 

 

Recommended

 

 

 

 

 

 

To ensure secure mounting of track brackets, side

 

 

 

 

door height

tools from

 

 

 

 

and center brackets, or steel angles to new or retro-fit

 

level header

 

 

page 5

 

 

 

construction, it is recommended to follow the procedures

 

 

 

 

 

 

 

 

 

 

 

outlined in DASMA Technical Data Sheets #156, #161 and

plumb jambs

 

 

 

 

 

#164 at www.dasma.com.

 

 

 

 

 

 

 

The inside perimeter of your garage door opening should

 

 

 

 

 

 

 

be framed with wood jamb and header material. The jambs

 

door

 

 

 

 

 

and header must be securely fastened to sound framing

 

 

 

 

 

 

members. It is recommended that 2” x 6” lumber be used.

 

width

 

 

 

 

 

 

 

 

 

 

 

 

The jambs must be plumb and the header level. The jambs

 

 

 

 

 

 

 

should extend a minimum of 12” (305 mm) above the top of

 

 

 

 

 

 

 

the opening for TorqueMaster counterbalance systems. For

 

 

 

 

 

 

 

low headroom applications, the jambs should extend to the

 

 

 

 

 

 

 

ceiling height. Minimum side clearance required, from the

headroom

 

 

 

 

 

opening to the wall, is 3-1/2” (89 mm).

header

 

 

 

backroom

 

IMPORTANT: Closely inspect jambs, header and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

mounting surface. Any wood found not to be sound,

 

 

 

 

 

 

 

must be replaced.

 

 

 

 

 

 

 

For TorqueMaster counterbalance systems, a suitable

 

 

 

 

jamb

 

mounting surface (2” x 4”) must be firmly attached to the

 

 

 

 

 

 

 

wall, above the header at the center of the opening.

 

 

 

 

 

 

 

NOTE: Drill a 3/16” pilot hole in the mounting surface to

 

 

 

 

 

 

 

avoid splitting the lumber. Do not attach the mounting

WEATHER SEAL

 

 

 

 

surface with nails.

 

 

 

 

 

 

 

 

 

 

 

Weather seal (may not be included) / Door stop:

 

 

 

 

 

 

 

Cut the weather seal or door stop (if necessary) to fit header

jamb

 

 

 

 

 

and jambs.

 

 

 

 

 

 

 

 

 

 

 

 

For quick install track: Align the header seal with the inside

 

 

 

 

 

 

 

edge of the header and temporarily secure it to the header

 

 

 

 

 

 

 

with equally spaced nails. Next, fit the jamb seals up tight

 

weather

 

 

 

weather

 

against the header seal and flush with the inside edge of the

 

 

 

 

 

 

seal

 

 

 

seal

 

jamb. Temporarily secure the jamb seals with equally spaced

 

 

 

 

 

 

 

 

 

 

 

 

nails approximately 12” to 18”. This will keep the bottom

 

 

 

 

 

 

 

section from falling out of the opening during installation.

 

 

 

 

 

 

 

For fully adjustable track: Align the header seal 1/8” to

jamb

 

jamb

1/8” to 1/4”

 

1/4” inside the header and temporarily secure it to the

Quick Install Track

 

Fully adjustable Track

 

header with equally spaced nails. Next, fit the jamb seals

 

 

 

 

 

 

 

 

 

up tight against the header seal and 1/8” to 1/4” inside the

 

Door

 

 

 

Door

 

jamb. Temporarily secure the jamb seals with equally spaced

 

stop

 

 

 

stop

 

nails approximately 12” to 18”. This will keep the bottom

 

Door

 

 

 

Door

 

section from falling out of the opening during installation.

 

 

 

 

 

 

Section

 

 

 

Section

 

NOTE: Do not permanently attach weather seal or door stop

jamb

 

jamb

1/8” to 1/4”

 

to the jamb at this time.

 

 

headroom requirement

 

 

HEADROOM REQUIREMENT: Headroom is defined as the

 

 

space needed above the top of the door for tracks, springs,

TRACK TYPE

TorqueMaster®

 

 

etc. to allow the door to open properly. If the door is to be

15” Radius track

12-1/2” (318 mm)

 

 

motor operated, 2-1/2” (64 mm) of additional headroom is

 

 

 

 

 

 

 

 

 

required.

backroom requirement

 

 

NOTE: 6” LHR Conversion Kit is available for 12” Radius only.

DOOR HEIGHT

TRACK

 

MANUAL

MOTOR

 

Contact your local Wayne-Dalton dealer.

 

 

 

 

LIFT

OPERATED

 

BACKROOM REQUIREMENT: Backroom is defined as the

 

 

 

 

 

8’0”

15” Radius

 

110”

137”

 

distance needed from the opening back into the garage to

 

 

(2794 mm)

(3479 mm)

 

 

 

 

 

allow the door to open fully.

 

 

 

 

 

 

10Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your local

yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

Image 10
Contents Series 4 Section Important NoticeTable of Contents Package Contents PRE-INSTALLATIONDoor Section Identification 3/16 Drill Bits Power DrillTools Required GlovesWinding bars can cause spring Energy to be released Torsion Spring Removal For Standard LiftFailure to use approved Suddenly, resulting in severe Or fatal injuryUnwind Springs Removal TorqueMaster SpringBracket and Drive Gear Extension Spring Removal Removing the Old DoorPreparing the Opening Tools Needed None InstallationAttaching Quick Install Flag Angle to Vertical Track FlagangleTap the horizontal angle towards Be installed as shownHorizontal Angle AsideBrackets Installing Q.I. Jamb Brackets Bottom Section Vertical TrackStacking Sections Endcap Top BracketsWith the second set of holes from 20 x 5/8 carriage boltsOperator Bracket Top Section Do not Raise Door Until Attaching Horizontal Track toInjury This step Hex nutsAdjusting Top Brackets Center Bracket Bushing Must install the center bracket bushingTorqueMaster Spring Tube Continue with Step Idrive opener on your garage door, youIdrive Installation Cable Drum Installation Tools Needed Lubricating Oil Drive Gear InstallationEnd Brackets Repeat for left hand side.`Installations on page 35, Figure B Counter InstallationSecuring Center Bracket Assembly Repeat for left hand side for double spring applicationsPositioning Support Bracket Mounting Disconnect Attaching Disconnect CablesHandle Bracket Bracket Disconnect handle. ThreadDisconnect handle Secure disconnect cable toTools Needed Locking Pliers Flat Tip Screwdriver Cable AdjustmentsTools Needed Vice Clamp Important do not USE Impact GUN to Wind SpringsWinding Bolt Rotation Setting Spring TensionRecommended Spring Turns Keep horizontal track Drum Wrap InstallationRear Support Parallel and within 3/4 Maximum of door edgeTools Needed Adjust weather seal or door stop ifAttach horizontal tracks to the rear Weather seal or door stop to both doorSide Lock DoorMaster TM BracketPull Rope Tools Needed Power Drill Drill BitNo Scew EYE Pull Rope Bottom Bracket Result in Severe or Fatal Injury Trolley OperatorOperator Must be Tested AT Time Door is fully open trolley rail willAcrylic Cleaning Instructions Cleaning Your Steel And Fiberglass Garage DoorGlass Cleaning Instructions Important do not USE a Pressure Washer on Garage DoorSteel Preparation For Painting Fiberglass Refinishing And Or FinishingLifetime Limited Warranty Model Thank you for your purchase