Wayne-Dalton 9800 Series installation instructions Adjusting Top Brackets

Page 22

15

Adjusting Top Brackets

 

 

 

Tools Needed:

With horizontal tracks installed, you can

7/16” Wrench

now adjust the top brackets.

 

Vertically align the top section of the

 

door with the lower sections. Once

 

aligned, position the top bracket slide,

 

out against the horizontal track.

 

Maintaining the slide’s position, tighten

 

the (2) 1/4” - 20 flanged hex nuts to

 

secure the top roller slide to the top

 

bracket base.

15

HORIZONTAL

track

top

 

SECTION

TOP BRACKET

 

 

SLIDE

(2)1/4” - 20

FLANGED HEX

NUTS

Correct

top

section

inCorrect

22Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your local

yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

Image 22
Contents Series 4 Section Important NoticeTable of Contents Package Contents PRE-INSTALLATIONDoor Section Identification 3/16 Drill Bits Power DrillTools Required GlovesWinding bars can cause spring Energy to be released Torsion Spring Removal For Standard LiftFailure to use approved Suddenly, resulting in severe Or fatal injuryUnwind Springs Removal TorqueMaster SpringBracket and Drive Gear Extension Spring Removal Removing the Old DoorPreparing the Opening Tools Needed None InstallationAttaching Quick Install Flag Angle to Vertical Track FlagangleTap the horizontal angle towards Be installed as shownHorizontal Angle AsideBrackets Installing Q.I. Jamb Brackets Bottom Section Vertical TrackStacking Sections Endcap Top BracketsWith the second set of holes from 20 x 5/8 carriage boltsOperator Bracket Top Section Do not Raise Door Until Attaching Horizontal Track toInjury This step Hex nutsAdjusting Top Brackets Center Bracket Bushing Must install the center bracket bushingTorqueMaster Spring Tube Continue with Step Idrive opener on your garage door, youIdrive Installation Cable Drum Installation Tools Needed Lubricating Oil Drive Gear InstallationEnd Brackets Repeat for left hand side.`Installations on page 35, Figure B Counter InstallationSecuring Center Bracket Assembly Repeat for left hand side for double spring applicationsPositioning Support Bracket Mounting Disconnect Attaching Disconnect CablesHandle Bracket Bracket Disconnect handle. ThreadDisconnect handle Secure disconnect cable toTools Needed Locking Pliers Flat Tip Screwdriver Cable AdjustmentsTools Needed Vice Clamp Important do not USE Impact GUN to Wind SpringsWinding Bolt Rotation Setting Spring TensionRecommended Spring Turns Keep horizontal track Drum Wrap InstallationRear Support Parallel and within 3/4 Maximum of door edgeTools Needed Adjust weather seal or door stop ifAttach horizontal tracks to the rear Weather seal or door stop to both doorSide Lock DoorMaster TM BracketPull Rope Tools Needed Power Drill Drill BitNo Scew EYE Pull Rope Bottom Bracket Result in Severe or Fatal Injury Trolley OperatorOperator Must be Tested AT Time Door is fully open trolley rail willAcrylic Cleaning Instructions Cleaning Your Steel And Fiberglass Garage DoorGlass Cleaning Instructions Important do not USE a Pressure Washer on Garage DoorSteel Preparation For Painting Fiberglass Refinishing And Or FinishingLifetime Limited Warranty Model Thank you for your purchase