Bryan Boilers 250, & 300 Annunciation Operation, Modulation Configuration Configure Modulation

Page 29

annunciation information, and switch between heating loops (Central Heat and Domestic Hot Water), as shown in Figure 25. If a password is required to change any of the settings on this page, the user can press the Login button to enter the password.

2.2.12ANNUNCIATION PAGE

►OPERATION►

ANNUNCIATION

Figure 26 Annunciation Page

The annunciation page shows the status of the load control input (call for heat), pre-ignition interlock (proof of gas valve closure), and the running interlock strings. The components are listed in the order they are wired. This page can be called up at any time from the operation page (Figure 25). This page is very helpful for troubleshooting a lockout 67 (ILK off). All components for a given string are wired in series. The first component that indicates off will be the safety device to check.

Date: 8-4-2010

Revision: 0

Form: 2396

2.2.13MODULATION CONFIGURATION

► CONFIGURE ► MODULATION

CONFIGURATION

Figure 27 Modulation Configuration

The modulation configuration page is used to set the modulation range of the boiler. The recommended maximum and minimum rpm values can be found in

2.2.14FIRING RATE CONTROL PAGE

► OPERATION ► FIRING RATE

FIELD

Figure 28 Firing Rate Control Page

The firing rate control page enables the user to change how the firing rate is controlled. The first option is for automatic control based on the current set point. The second option enables

23

Image 29
Contents Triple-Flex High Efficiency Boilers Triple-Flex 150, 200, 250 High Efficiency Boilers Table of Contents Lead Drop-Stage On Error Ldse Figures Date Date Revision Form Clearances Boiler FoundationMinimum Clearances to Combustible Surfaces DIMBoiler Connections Safety Relief ValvesFlow Connection Expansion Tank ConnectionsElectrical Requirements Venting of GAS Train ComponentsKW HP Combustion AIR SupplyLOUVERS, GRILLES, and Screens Combustion AIR OpeningsFlue GAS Venting System Design & InstallationScfm Combustion AIR and Venting Requirements for CanadaBefore Placing Boiler in Operation Marking of GAS VentsTest of GAS Piping Hydrostatic Test of Boilers and SystemStart-Up and Operation Triple-Flex High Efficiency Boilers TRIPLE-FLEX Front View Boiler AssemblyTriple-Flex Rear View TRIPLE-FLEX Rear ViewTRIPLE-FLEX Behind the Cabinet Door TRIPLE-FLEX Left Side ViewTRIPLE-FLEX Right Side View Air Flow Switch TRIPLE-FLEX Left Flue Collector View Pilot Spark Igniter AssemblyTRIPLE-FLEX Right Flue Collector View POWER-UP ValidationHome Sola Hydronic Control SystemKeyboard NavigationStatus Configuration ConfigureSample Configuration Configuration PasswordSafety Verification Configure Verify Change Parameter SettingsSafety Parameter User Confirmation FAULT/ALARM HandlingHome Page Lockout Info BAR Lockouts Clear Lockout OperationFiring Rate Control Operation Firing Rate Field Modulation Configuration Configure ModulationAnnunciation Operation Calibrate Touch Screen Setup Advanced Setup Diagnostics Advanced Setup Setup Advanced SetupSystem Time Setup Advanced Setup Date & Time Outdoor Reset Configure Reset / Reboot DisplayAdvanced Setup Display Reset Safety Verification Configure CH Central Heat Configuration Configure Sensor ConfigurationConfigure CH Central Heat Configuration PID Sound Pressure LevelsSound Pressure Readings Alert Codes Modbus CommunicationDHW RPMODR ILK A2D SLOHFS PIIRevision PRE Checks and Setup Test SetupBoiler Commissioning ModulationDRY RUN Pilot AdjustmentAdjusting Boiler Minimum Input Adjusting Boiler Maximum InputInitial Light OFF IWCGAS Meter Readings CFH = 3600Vc gc CFH = ft 3 hr −1 of gas Vc = ft clockedPII Or L TroubleshootingDate ILK OFF LCI OFFPII OFF ILK on Weak VsnsrAre OEM Specific Fault Codes Fault CodesOFF ThroughOFF Blower LCI High Limit setpoint setting 228 Invalid Reserved Care and Maintenance Boil OUT Procedure Boiler Water Treatment Draining the SystemDo not Flush the System Through the Boiler Suggested Maintenance Schedule External FIRE-SIDE CleaningDate Revision Form Lead Lag Lead LAG LL Master General Operation General Description of the Lead LAG ApplicationDrop-stage method Drop-stage detection timing LL / Multi-Boiler Field Wiring System Wiring HookupLEAD-LAG Operation Slave Parameters Slave Operation and SetupSlave Mode USE FIRST, Equalize RUNTIME, USE Last Overall Control LL Master Operation and SetupSlave Status Manager Periodic Data Polling MessagesInvalid Response or no Response AbnormalFaultCounter Used to tolerate momentary abnormalityMaster Heat Demand LL CH Demand Switch DISABLE, STAT, Environcom Remote StatMaster Service Status Master Active ServiceModulation Sensor LL Modulation Sensor S5Demand and Rate Implementation Rate AdjustmentIntegrator Compensation Rate Allocation Method Parallel Commonbase Limited Rate AllocationBase Load Common 0-100% Overflow and Underflow Modulating StageStagerstate = Active Burner DemandStagerstate = Idle Error Threshold ADD-STAGE Error Threshold DegreesADD-STAGE Rate Offset -100% to +100% ADD-STAGE ConditionLL ALL Boilers OFF Threshold Temperature or None DROP-STAGE Error Threshold DegreesDROP-STAGE Rate Offset -100% to +100% DROP-STAGE ConditionForce Lead Rotation Time Hhmm or None Lead DROP-STAGE on ErrorLAG Selecton Method Sequence ORDER, Measured RUN Time Date Revision Form Forced Lead Rotation Sequencer 1 Minute EventSlave Write Data Slave Read Data