Bryan Boilers Triple-Flex 150, 250, & 300, 200 service manual Care and Maintenance

Page 56

Date: 8-4-2010

Revision: 0

Form: 2396

Section 3 Care and Maintenance

50

Image 56
Contents Triple-Flex High Efficiency Boilers Triple-Flex 150, 200, 250 High Efficiency Boilers Table of Contents Lead Drop-Stage On Error Ldse Figures Date Date Revision Form Boiler Foundation ClearancesMinimum Clearances to Combustible Surfaces DIMSafety Relief Valves Boiler ConnectionsFlow Connection Expansion Tank ConnectionsVenting of GAS Train Components Electrical RequirementsKW HP Combustion AIR SupplyCombustion AIR Openings LOUVERS, GRILLES, and ScreensDesign & Installation Flue GAS Venting SystemCombustion AIR and Venting Requirements for Canada ScfmMarking of GAS Vents Before Placing Boiler in OperationHydrostatic Test of Boilers and System Test of GAS PipingStart-Up and Operation Triple-Flex High Efficiency Boilers Boiler Assembly TRIPLE-FLEX Front ViewTRIPLE-FLEX Rear View Triple-Flex Rear ViewTRIPLE-FLEX Behind the Cabinet Door TRIPLE-FLEX Left Side ViewTRIPLE-FLEX Right Side View Air Flow Switch Pilot Spark Igniter Assembly TRIPLE-FLEX Left Flue Collector ViewPOWER-UP Validation TRIPLE-FLEX Right Flue Collector ViewHome Sola Hydronic Control SystemNavigation KeyboardConfiguration Configure StatusConfiguration Password Sample ConfigurationChange Parameter Settings Safety Verification Configure VerifyFAULT/ALARM Handling Safety Parameter User ConfirmationInfo BAR Lockouts Clear Lockout Operation Home Page LockoutFiring Rate Control Operation Firing Rate Field Modulation Configuration Configure ModulationAnnunciation Operation Calibrate Touch Screen Setup Advanced Setup Diagnostics Advanced Setup Setup Advanced SetupSystem Time Setup Advanced Setup Date & Time Outdoor Reset Configure Reset / Reboot DisplayAdvanced Setup Display Reset Safety Verification Configure CH Central Heat Configuration Configure Sensor ConfigurationConfigure CH Central Heat Configuration Sound Pressure Levels PIDSound Pressure Readings Modbus Communication Alert CodesRPM DHWODR ILK SLO A2DHFS PIIRevision Test Setup PRE Checks and SetupBoiler Commissioning ModulationPilot Adjustment DRY RUNAdjusting Boiler Maximum Input Adjusting Boiler Minimum InputInitial Light OFF IWCCFH = 3600Vc gc CFH = ft 3 hr −1 of gas Vc = ft clocked GAS Meter ReadingsTroubleshooting PII Or LDate ILK OFF LCI OFFPII OFF ILK on Vsnsr WeakFault Codes Are OEM Specific Fault CodesOFF ThroughOFF Blower LCI High Limit setpoint setting 228 Invalid Reserved Care and Maintenance Boil OUT Procedure Boiler Water Treatment Draining the SystemDo not Flush the System Through the Boiler External FIRE-SIDE Cleaning Suggested Maintenance ScheduleDate Revision Form Lead Lag General Description of the Lead LAG Application Lead LAG LL Master General OperationDrop-stage method Drop-stage detection timing System Wiring Hookup LL / Multi-Boiler Field WiringLEAD-LAG Operation Slave Parameters Slave Operation and SetupSlave Mode USE FIRST, Equalize RUNTIME, USE Last LL Master Operation and Setup Overall ControlPeriodic Data Polling Messages Slave Status ManagerAbnormalFaultCounter Used to tolerate momentary abnormality Invalid Response or no ResponseLL CH Demand Switch DISABLE, STAT, Environcom Remote Stat Master Heat DemandMaster Active Service Master Service StatusModulation Sensor LL Modulation Sensor S5Demand and Rate Implementation Rate AdjustmentIntegrator Compensation Rate Allocation Method Parallel Commonbase Limited Rate AllocationBase Load Common 0-100% Modulating Stage Overflow and UnderflowStagerstate = Active Burner DemandStagerstate = Idle ADD-STAGE Error Threshold Degrees Error ThresholdADD-STAGE Rate Offset -100% to +100% ADD-STAGE ConditionDROP-STAGE Error Threshold Degrees LL ALL Boilers OFF Threshold Temperature or NoneDROP-STAGE Rate Offset -100% to +100% DROP-STAGE ConditionForce Lead Rotation Time Hhmm or None Lead DROP-STAGE on ErrorLAG Selecton Method Sequence ORDER, Measured RUN Time Date Revision Form Sequencer 1 Minute Event Forced Lead RotationSlave Write Data Slave Read Data