Periodic Maintenance
[ ] Complete all recommended quarterly maintenance procedures.
[ ] Lubricate the vane control linkage bearings, ball joints, and pivot points; as needed a few drops of light machine oil
[ ] Lubricate vane operator tang
[ ] Lubricate the oil filter shutoff valve
[ ] Drain the contents of the rupture disc and purge discharge ventline
container minimally and more often if the purge is operated excessively.
Also, apply one or two drops of oil on the vane operator shaft and spread it into a very light film; this will protect the shaft from moisture and rust.
Off-Season Maintenance
During those periods of time when the chiller is not operated, be sure the control panel is energized. This is to keep the purge operational, the oil heater warm and will also keep air out of the machine.
Annual Maintenance
Shut down the chiller once each year to check the items listed ; a more detailed inspection checklist is
provided on the ‘‘Annual Inspection Checklist and Report’’ illustrated in this manual.
[ ] Perform the annual maintenance procedures referred to in the Maintenance Section of the purge manual.
[ ] Use an ice water bath to verify that the accuracy of the evaporator refrigerant temperature sensor (4R10) is still within tolerance (+ or - 2.0° at 32°F (1° at 0°C)). If the evaporator refrigerant temperature displayed on the UCP’s
Note: If the sensor is exposed to temperature extremes outside its normal operating range (0°F to 90°F) (- 18°C to 32°C), check its accuracy at
94 |